KitLog pro

Powered By Kitlog Pro v2.0

Brookes Web Site
85 Logs Found 
 Date
Hours
Work Log Summary

Details

 03-17-2011
1.5
Add Fuel
Details

 02-17-2011
4.0
Fuel SO Valve
Details
       

 02-16-2011
7.0
Fuel Shutoff Valve
Details
       

 12-30-2010
5.0
Install Fuel pump and filter plus other
Details

 10-02-2010
7.0
Reinstall fuel lines
Details
     

 09-29-2010
9.0
Fuel and vent lines
Details
       

 09-28-2010
8.0
Fuel lines in cabin
Details

 09-12-2010
2.5
Mold for fuel shutoff valve control
Details
       

 09-10-2010
3.5
Outboard end strake reinforcement
Details
       

 08-28-2010
5.0
Install sump tank, glass bulkheads
Details
     

 08-27-2010
9.0
Strake cutouts
Details
       

 08-26-2010
3.5
Treat strake cutouts
Details
       

 08-26-2010
3.0
Sump tank capacity and mounting tabs
Details

 08-24-2010
3.0
Glass sump tank
Details
     

 08-23-2010
3.0
Cut corners off sump tank
Details
       

 08-21-2010
3.5
Sump tank
Details
     

 08-20-2010
5.0
Leak check CP fuel tanks
Details
       

 07-13-2010
7.0
Fuel vent system
Details
       

 06-30-2010
8.0
Glass inside wheel wells/cut gear leg
Details
       

 06-29-2010
7.5
Preparing wheel well
Details
       

 06-28-2010
6.0
Strake glassing
Details
       

 06-26-2010
8.3
Glass in Slant fuel bulkheads
Details
       

 06-25-2010
8.0
Jeffco slant baggage bulkheads
Details
       

 06-24-2010
6.5
More fuel system glassing
Details
       

 06-23-2010
1.5
Sanded wheel well area
Details
       

 06-23-2010
5.0
Glass Main spar to strake and bulkhead
Details
       

 06-22-2010
4.0
Prepare sump tank
Details
       

 06-22-2010
3.0
Door/strake
Details

 06-21-2010
8.0
Install Leading edge strake tips
Details
       

 06-09-2010
4.0
Glass top strake to fuselage
Details
       

 06-09-2010
2.0
Glass in pilot wheel/gear well
Details
     

 06-09-2010
2.0
Glass in CP fuel sight guage
Details
     

 05-31-2010
4.5
Glass underside of wheel well
Details
       

 05-28-2010
3.0
Wing Strake cutout
Details

 05-13-2010
6.0
Fixing copilot strake cover
Details
       

 05-12-2010
8.0
Pilot Strake Covered!
Details
       

 05-11-2010
6.0
Copilot Stake Covered!
Details
       

 05-10-2010
7.5
Strake Prep
Details
       

 05-01-2010
9.5
Jeffco and glassing strakes
Details
       

 04-30-2010
7.0
Jeffco CP Strakes
Details
       

 04-29-2010
8.0
Glassing Bulkheads and Baffles
Details
       

 04-27-2010
10.5
Sight guage and bulkheads
Details
       

 04-26-2010
8.0
Sight guage and bulkheads
Details
       

 04-14-2010
7.0
Bulkheads and Jeffco
Details
       

 04-13-2010
11.0
Bulkheads
Details
       

 04-12-2010
6.5
Bulkheads and hardpoints
Details
       

 04-09-2010
7.0
Bulkheads and Baffles
Details
       

 04-08-2010
9.0
Hard points and bulkheads
Details
       

 04-07-2010
4.0
Fuel system hardpoints
Details
       

 03-15-2010
7.5
Install fuel caps, more bulkheads
Details
       

 03-12-2010
8.0
Jeffco, fuel sender, copilot baffles
Details
       

 03-11-2010
8.0
Glass in Baffles, Sight guages
Details
       

 03-10-2010
3.0
Fuel strake bulkheads
Details
       

 03-10-2010
4.0
Fuel Sight Guages
Details
     

 03-02-2010
9.0
Epoxy fuel system hardpoints, glass bulkheads
Details
     

 02-26-2010
8.0
More bulkhead work
Details
       

 02-25-2010
9.5
Copilot wheel well
Details
       

 02-24-2010
8.0
Fuel Fittings, sight guages
Details
       

 02-23-2010
9.0
Fitted copilot wheel/gear well
Details
       

 02-22-2010
10.0
Glass in bulkheads
Details
       

 02-19-2010
8.0
Shape and cleanup bulkhead flanges
Details
       

 02-18-2010
8.0
Built Flanges for bulkheads
Details
       

 02-17-2010
8.0
Cutting and installing copilot wheelwell
Details
       

 02-16-2010
8.0
Fitting copilot wheel well
Details
       

 02-15-2010
8.0
Copilot Wheel Well
Details
       

 02-12-2010
8.0
Strake baggage area bulkheads
Details
       

 02-11-2010
6.0
Fuel System Baffles
Details
       

 01-28-2010
9.0
Bulkhead fitting
Details
       

 01-27-2010
8.0
Install bulkheads
Details
       

 01-26-2010
8.5
Fitting Bulkheads
Details
       

 01-18-2010
8.0
Modify wheel well
Details
       

 01-15-2010
8.0
Fit wheel wells and mod wheel well
Details
       

 01-14-2010
9.0
Cutting well to fit gear
Details
       

 01-13-2010
9.0
Cut gear well holes
Details
       

 01-12-2010
4.5
Cut gear holes in lower strake
Details
       

 01-11-2010
6.0
Glass in lower strake
Details
       

 01-04-2010
4.5
Adhere Lower Strake to Main Spar
Details
       

 12-31-2009
5.5
Final fit of lower strakes
Details
       

 12-30-2009
6.0
Glass aft part of lower strake
Details
       

 12-29-2009
7.5
Hang wings, fit lower strakes
Details
       

 12-28-2009
8.0
Prepare fuselage and strakes
Details
       

 12-09-2009
8.0
Fuselage prep for strakes
Details
       

 12-08-2009
4.0
Lower Strake alignment
Details
       

 12-08-2009
3.5
Cut out Strake bulkheads
Details
       

 10-02-2007
2.0
Glass fuel baffle material
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.