KitLog pro

Powered By Kitlog Pro v2.0

Brookes Web Site
' style=
Date:  12-31-2009
Number of Hours:  5.50
Manual Reference:  9.2.3
Brief Description:  Final fit of lower strakes

Finished fitting the lower strakes. Marked fuselage for strake position. Bondoed blocks to fuselage side to support strake during bonding process. Prepared aluminum I beam attach points for holding aft part of strake in position against main spar. Finally finished glassing Dyvinicel sheet for bulkheads. JC 1-3
' style=

Blocks in position

Blocks in position

' style=

I-beam

I-beam

' style=

Bulkhead Material

Bulkhead Material

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.