Ground down the leading edge junction of upper and lower strake. Ground off jeffco and tapered lower strake down to about 1 inch from seam. Block sanded and ready for glassing.
Fit both slant bulkheads. Prepared area for Jeffco. Put 2 coats of jeffco on fuel side of bulkhead and both sides of flanges. Coated flanges and edges of bulkhead with liberal amounts of jefco, cabo, and flox. Placed bulkheads in position then filled in voids with additional jeffco, cabo, and flox. Held bulkheads in position with bracing to the center keel