KitLog pro

Powered By Kitlog Pro v2.0

Brookes Web Site
' style=
Date:  6-25-2010
Number of Hours:  8.00
Manual Reference:  9
Brief Description:  Jeffco slant baggage bulkheads

Ground down the leading edge junction of upper and lower strake. Ground off jeffco and tapered lower strake down to about 1 inch from seam. Block sanded and ready for glassing.

Fit both slant bulkheads. Prepared area for Jeffco. Put 2 coats of jeffco on fuel side of bulkhead and both sides of flanges. Coated flanges and edges of bulkhead with liberal amounts of jefco, cabo, and flox. Placed bulkheads in position then filled in voids with additional jeffco, cabo, and flox. Held bulkheads in position with bracing to the center keel
' style=

Slant bulkheads braced in

Slant bulkheads braced in

' style=

Leading edge ground down

Leading edge ground down

' style=

Closeup of leading edge

Closeup of leading edge

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.