Prepared edges of all baffles/bulkheads for top installation by exposing about a 1/8 in of fiberglass each side on the inside. Built flanges for lower and aft edge of slant bulkhead. Glassed in aft baggage compartment bulkhead. Added one layer of bid to both sides of the aft half of the long baffle.
Looking aft between long baffle and slanted bulkhead
Closeup of edge preparation
Looking forward at aft baggage bulkhead between long baffle and fuselage bulkhead