Cleaned up last glassing. Marked position for CP fuel sight guage. Drilled 1" holes through inside wall and filled with cabo and flox. Routed out inner skin and foam in lower strake skin to set sight guage as low as possible. Applied jeffco to aft bulkhead and hard to reach areas around wheel well. Built flange for slant bulkhead on CP side