KitLog pro

Powered By Kitlog Pro v2.0

Brookes Web Site
' style=
Date:  5-29-2008
Number of Hours:  2.50
Manual Reference:  Chap 7
Brief Description:  Grind top of gear legs make shims

Ground the top corner of both gear legs to eliminate interference with over center linkage when gear is being retracted. Checked movement after adjustment and gear travels smoothly with linkage installed throughout range.

Made shims (from washers) and super glued them against aluminum bushings on the side where it is recessed into gear bulkhead or firewall. This will be glassed over later.
' style=

Drinding top of gear and collars

Drinding top of gear and collars

' style=

Work bench setup

Work bench setup

' style=

Gear operates smoothly now.

Gear operates smoothly now.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.