KitLog pro

Powered By Kitlog Pro v2.0

Brookes Web Site
' style=
Date:  9-17-2010
Number of Hours:  10.00
Manual Reference:  7.8.2
Brief Description:  Secure Hydraulic lines

Fabricated new aluminum line for pilot side and moved outboard. Moved bulkhead fitting outboard. Installed adel clamps on both T's to secure system from movement caused by flexible hoses. Installed gas spring. Installed all nose gear linkages with temporary nuts.
' style=

Looking forward

Looking forward

' style=

Looking aft

Looking aft

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.