KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  2-2-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Receive & rehang rebuit engine

20 degrees today and windy...burr. Was 90 degrees the date in July that I pulled the engine to ship to Barrett. Angie helped me get the crate loaded on trailer (with no forklift) at Capital City. Actually her idea on how to get the crate on with only the hoist and without breaking down the crate. We then took it to N94 and got it unloaded and hung. Took a lot of fiddling to get the engine mount holes all lined up.

Very beefy crate from Barrett.

Torqued mount bolts to 34 #/ft (400 #/in.) safetied star washers on mounts
' style=

get engine to N94, unload & hang

get engine to N94, unload & hang

' style=

ready to lift from crate

ready to lift from crate

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.