KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  2-2-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  continue engine re-install

installed quick drain, spider drain lines and Reiff preheat bands and cables. Much easier to do the bands with the baffling off.

Took crate, hoist and trailer back to hangar at Cap City.
' style=

engine mounts torqued and safetied

engine mounts torqued and safetied

' style=

R side Reiff bands

R side Reiff bands

' style=

L side Reiff bands

L side Reiff bands

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.