KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  10-9-2017
Number of Hours:  2.25
Manual Reference:  
Brief Description:  Misc. finalizing items

Finished up RPM sensor wiring; RTV'd fuel and MAP lines; reconnect and secure Dynon D-1 power plug behind panel; replaced nose fairing screws with shortened 6-32 torx SS screws; calibrate elev., rudder trim, calibrate flaps; test 12V power outlets; test door seal ops...Ok but no annuc. on G3; verify numerous G3 settings and alarms
B nut added to oil cooler
' style=

old, drilled AN3 bolt at oil cooler

old, drilled AN3 bolt at oil cooler

' style=

new B nut in; cooler closed

new B nut in; cooler closed

' style=

cooler open.  All good

cooler open. All good

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.