KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  10-4-2010
Number of Hours:  2.00
Manual Reference:  
Brief Description:  tighten all panel brackets; ground VP control unit

tighten all panel brackets; ground VP control unit. Continue to route power and ground wires behind panel... this is endless.

Most wires are run to about where they need to be. Need to clean up a bit more and then start terminating the wires to the respective connectors....mostly the big round P-1 connector.
' style=

pitot-static lines

pitot-static lines

' style=

...and wire mess starting to come together

...and wire mess starting to come together

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.