KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  9-11-2010
Number of Hours:  0.75
Manual Reference:  
Brief Description:  re-level magnetometer

used washer set up to level magnetometer...1st to fuselage level and then to EFIS1 in panel. Added brass washers as needed. Torqued down all nuts (brass) , added torque seal; checked that cable is tight.

Digital level would not fit back with magnetometer...used small torpedo level. Looks good.

TRV all holes and grommets in VS for air plenum.
' style=

leveled in pitch and roll

leveled in pitch and roll

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.