N144GP Lancair Super ES
' style=
Date:  8-9-2010
Number of Hours:  7.50
Manual Reference:  
Brief Description:  wiring; adels; install TPM cables

more wiring; install adel clamps on click bonds from last week

terminate; crimp, solder, shrink tie all CHT and EGT connectors

Plan routing for control cables

install bulkhead fitting for ram air cable

install throttle, prop and mixture controls and cables

Plan routing for alt air, oil cooler, heater

misc shop...about .5 hours; fool with air chuck to nose tire...need a deifferent checuk or may need to drill an access opening like I did for the mains
' style=

CHT-EGT terminals installed

CHT-EGT terminals installed

' style=

T-P-M cables installed

T-P-M cables installed