installed clevis bracket and 24v flap motor. Of course, the bracket had 2 ways it could go in (which I did not notice at 1st). So, took it out and reinstalled it. Fit on bolts bonded in fuselage was tight, but all is good. Torqued to 20 In/#
Need to safty wire the end that attches to the flap torque tube per comment on ES group.