KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  12-14-2007
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Left elevator mistake

Arnie and I spent most of the afternon ripping off the trailing edge of the elevator off, sanding off old flox, realigning, prep to re-close.

Will rebond Monday morning, 12/17/07

Adam is off sick.
' style=

Not good. This was even with 1/2

Not good. This was even with 1/2" plywood template used on top to spread weight when bonding

' style=




' style=

Too thick; ripped out about 1/2 left elevator trailing edge to repair

Too thick; ripped out about 1/2 left elevator trailing edge to repair

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.