KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  9-3-2011
Number of Hours:  4.75
Manual Reference:  
Brief Description:  get ready for wings; 2 BID nose pant

re-organized hangar in prep for tomorrow's wing sloshing and hanging party. Vacummed, blew and wiped down spar bax; capped fuel lines; sanded some WLS runs on bottom of wing TE. Readied wires in wing root.

Attached top bearing of flap rod to flap torque tube
' style=

flap rod attached at top

flap rod attached at top

' style=

ready to go

ready to go

' style=

spar box ready

spar box ready

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.