Powered By Kitlog Pro v2.0
N144GP Lancair Super ES
Lancair Super ES
Speed Brakes
8-6-2018
< Previous Log Entry
Next Log Entry >
Date:
8-6-2018
Number of Hours:
1.00
Manual Reference:
Brief Description:
SB J1 control cable wiring
fast ons to brown and white... will go to upper and lower terminals of switch (correct DPST switch on its way from Stein)
need one add'l female faston for red 24+ power lead that goes to swich center terminal
soldered ground pig tail to green LED; butt spliced to other 2 ground leads (ship ground and ground wire to ALC)
soldered red pig tail to 24+ on green LED (white dot terminal); butt spliced to blue ALC lead; installed 24v green LED to panel
green, orange, yellow wires from ALC not used; taped up and kept for future spares
J1 cable form ALC through fuel tunnel
cable routed; terminating wires
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Lightning (EAB-LSA) Home
Lancair Super ES Home
Category
# Logs
# Hours
All
1827
4433
Avionics
113
163
Bodywork - misc.
10
25
Electrical
23
36
Elevators
15
60
Empennage
27
28
Engine
33
86
Firewall forward
77
163
Flying - test flying
29
94
Fuselage
633
1070
Garmin 3X Touch pane
139
256
Garmin GMC 507 Autop
18
35
Gear and wheels
102
196
Horizontal Stab
75
148
Interior
7
18
Miscellaneous
128
298
Move
15
60
Paint
1
973
Prop
7
13
Research, prep shop,
1
1
Speed Brakes
22
25
Vert Stab - Rudder
136
166
Wings
163
393
Wiring
53
126
Copyright © 2001-2024 Matronics. All Rights Reserved.