Pulled out GMU22/ P-12 cable; then run opposite direction to get gender of connectors right; rang out and repinned. Connected cable to magnetometer and tidied up cables back there a bit.
redid adels; new zip ties
connected P-5 (trims,flaps) behind panel. Tight to one part of the CPC!
Pulled out old ELT 2C GPS signal cable; ELT will be completely on a new 3c shielded cable
Still studying adding a brace to each side at top. Haven't found a good workable place yet. There are screw holes in top of panel blank... I think I had braces planned there before and changed my mind.
Tidied up hangar; put a lot of supplies away. Probably not for good for the upgrade, but it looks a lot neater
Next session will work on power and ground connections and RG400 antenna connections