Powered By Kitlog Pro v2.0
N144GP Lancair Super ES
Lancair Super ES
Garmin 3X Touch pane
5-23-2017
< Previous Log Entry
Next Log Entry >
Date:
5-23-2017
Number of Hours:
2.50
Manual Reference:
Brief Description:
work on GMU 22 magnetometer shelf
Made up a 1/4" phenolic shelf to mount on old mag. shelf above rudder bellcrank.
Used laser level to align to longitudinal axis. Used small string level to level side to side. Took 2 brass washer on left two studs
Began marking out drill pattern for GMU 44 mount base on phenolic.
laser level "secured" to phenolic! Hey, it worked.
bottom part of GMU 44 mount
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Lightning (EAB-LSA) Home
Lancair Super ES Home
Category
# Logs
# Hours
All
1827
4433
Avionics
113
163
Bodywork - misc.
10
25
Electrical
23
36
Elevators
15
60
Empennage
27
28
Engine
33
86
Firewall forward
77
163
Flying - test flying
29
94
Fuselage
633
1070
Garmin 3X Touch pane
139
256
Garmin GMC 507 Autop
18
35
Gear and wheels
102
196
Horizontal Stab
75
148
Interior
7
18
Miscellaneous
128
298
Move
15
60
Paint
1
973
Prop
7
13
Research, prep shop,
1
1
Speed Brakes
22
25
Vert Stab - Rudder
136
166
Wings
163
393
Wiring
53
126
Copyright © 2001-2024 Matronics. All Rights Reserved.