Date
|
Hours
|
Work Log Summary
|
Details
|
01-20-2017
|
2.00
|
Cockpit Rails, Roll Bar, and firewall
|
Details
|
|
|
01-14-2017
|
3.50
|
Cockpit rails, Instrument panel, and fwd top skin
|
Details
|
|
|
01-11-2017
|
1.50
|
Prepped and primed floorboard parts
|
Details
|
|
|
01-10-2017
|
2.00
|
Deburred and dimpled floorboards and stiffeners
|
Details
|
|
|
01-08-2017
|
3.00
|
Fabricated forward floorboards/steps
|
Details
|
|
|
01-07-2017
|
5.00
|
Big Day! First day that we all got a chance to sit
|
Details
|
|
|
01-04-2017
|
1.50
|
Worked on floorboards
|
Details
|
|
|
01-03-2017
|
3.00
|
Worked on floorboards, and put fuselage back in cr
|
Details
|
|
|
01-02-2017
|
2.00
|
Finished firewall work, worked on spar bulkhead an
|
Details
|
|
|
01-01-2017
|
5.00
|
Worked on front seat, and F443 brackets
|
Details
|
|
|
12-31-2016
|
1.00
|
Firewall work today.
|
Details
|
|
|
12-26-2016
|
3.00
|
F451 Tunnels, and F461 ends
|
Details
|
|
|
12-23-2016
|
2.00
|
Flipped the fuse upside down, did some riveting on
|
Details
|
|
|
12-20-2016
|
1.00
|
Worked on Front Seat
|
Details
|
|
|
12-11-2016
|
3.00
|
Fabricated Brake Pedals
|
Details
|
|
|
02-11-2016
|
2.00
|
Reskinning Horizontal stab
|
Details
|
|
|
02-07-2016
|
2.00
|
Riveted bellcrank, cut out instrument panel
|
Details
|
|
|
01-09-2016
|
4.00
|
F417, bellcrank, F419 aft deck plate, floorboards.
|
Details
|
|
|
12-29-2015
|
4.00
|
419 deck plate work, canopy rails
|
Details
|
|
|
12-28-2015
|
3.00
|
F419 deck plate initial fit, looked at canopy rail
|
Details
|
|
|
12-27-2015
|
1.50
|
Test fit the stab, first look at F419 aft deck pla
|
Details
|
|
|
12-23-2015
|
2.00
|
Built rolling cradle for the fuse, took it outside
|
Details
|
|
|
12-20-2015
|
3.00
|
Big day! Fuselage is out of the jig!
|
Details
|
|
|
12-13-2015
|
3.00
|
Riveting, nutplates, and hinges
|
Details
|
|
|
12-12-2015
|
2.00
|
Side skin riveting
|
Details
|
|
|
11-27-2015
|
2.00
|
Riveted F402 together, bottom skin work
|
Details
|
|
|
11-21-2015
|
8.00
|
All forward skins are primed and ready to reinstal
|
Details
|
|
|
11-19-2015
|
2.00
|
Finally riveting the ribs to the firewall and spar
|
Details
|
|
|
11-17-2015
|
1.00
|
Working on the frward skins, and tunnel fairings
|
Details
|
|
|
11-15-2015
|
4.50
|
Riveted aft fuse together!
|
Details
|
|
|
10-31-2015
|
4.50
|
Misc. riveting, skin work
|
Details
|
|
|
10-26-2015
|
1.50
|
Backriveted center longeron on aft side skins
|
Details
|
|
|
10-21-2015
|
6.00
|
Drilling and shaping the four forward skins
|
Details
|
|
|
10-19-2015
|
1.00
|
Initial fit/drilling of RH forward side skins.
|
Details
|
|
|
10-17-2015
|
4.00
|
Finished drilling the F422 belly skin, and more
|
Details
|
|
|
10-14-2015
|
2.00
|
Working my way back on the belly skin and splice.
|
Details
|
|
|
10-07-2015
|
4.00
|
Reassembling primed fuse parts.
|
Details
|
|
|
09-27-2015
|
3.00
|
MEK bath and prime for all the aft fuse parts
|
Details
|
|
|
09-23-2015
|
3.00
|
Preparing aft fuse parts for prime.
|
Details
|
|
|
09-22-2015
|
3.00
|
Angie surprised me with some solo work today!
|
Details
|
|
|
09-21-2015
|
9.00
|
BIG DAY! Getting aft fuselage ready for rivets
|
Details
|
|
|
09-20-2015
|
1.50
|
F409 Bulkhead new flexi-flange
|
Details
|
|
|
09-13-2015
|
2.50
|
Worked on the F422 FWD belly skin
|
Details
|
|
|
09-12-2015
|
6.00
|
Parts fabrication, and forward belly skin
|
Details
|
|
|
09-10-2015
|
2.00
|
Fabricated seat belt tie-ins to the rear spar, and
|
Details
|
|
|
09-09-2015
|
2.50
|
Repaired F411, Fabricated F405 parts
|
Details
|
|
|
08-31-2015
|
1.50
|
Drilled floor ribs to rear spar bulkhead, and dril
|
Details
|
|
|
08-22-2015
|
4.00
|
F405/406 fabrication
|
Details
|
|
|
08-21-2015
|
2.00
|
Drilling Longerons to weldmounts, and floor ribs t
|
Details
|
|
|
08-18-2015
|
1.50
|
Riveted rear spar carry-through
|
Details
|
|
|
03-12-2015
|
1.50
|
Continued drilling aft fuselage skins
|
Details
|
|
|
03-10-2015
|
4.00
|
Angie and I worked on the aft side skins today.
|
Details
|
|
|
03-07-2015
|
3.00
|
Drilled 426 and 427 skins to the skeleton.
|
Details
|
|
|
03-07-2015
|
3.00
|
Drilled 426 and 427 skins to the skeleton.
|
Details
|
|
|
03-03-2015
|
2.50
|
Re-leveled firewall, and fabricated LWR/FWD longer
|
Details
|
|
|
03-01-2015
|
2.50
|
Drilled bulkheads to longerons, started skins
|
Details
|
|
|
02-27-2015
|
2.50
|
Worked on F411 and 412 area with tailwheel spring
|
Details
|
|
|
02-25-2015
|
1.50
|
Centered and clamped longerons to jig.
|
Details
|
|
|
02-21-2015
|
2.00
|
Worked on the seat ribs and F406 bulkhead
|
Details
|
|
|
02-16-2015
|
1.50
|
|
|
|
|
02-08-2015
|
5.00
|
|
|
|
|
02-07-2015
|
5.00
|
|
|
|
|
01-12-2015
|
1.50
|
Drilled upper firewall weldments to firewall and j
|
Details
|
|
|
01-11-2015
|
3.00
|
Riveted firewall halves together and located weldm
|
Details
|
|
|
01-10-2015
|
2.50
|
Quite a bit of work on bulkhead frames today
|
Details
|
|
|
12-22-2014
|
6.00
|
Began assembling the fuselage jig
|
Details
|
|
|
12-13-2014
|
2.50
|
First Fuselage Entry!! - Started on the Firewall
|
Details
|
|