Powered By Kitlog Pro v2.0
Greggs RV-4
RV-4
Fuselage
1-10-2015
< Previous Log Entry
Next Log Entry >
Date:
1-10-2015
Number of Hours:
2.50
Manual Reference:
Brief Description:
Quite a bit of work on bulkhead frames today
As the pictures show, I spent some time today working on bulkheads for the fuse. Not pictured is some drilling done on the F-401 firewall bulkhead as well.
Bulkhead F-404 (Spar box)
Bulkheads F-407, 408, and 409 clecoed
Bulkhead F-402 Drilled and clecoed
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-4 Home
Category
# Logs
# Hours
All
206
582
Ailerons
14
29
Empennage
51
159
Fuselage
67
196
Wings
74
198
Copyright © 2001-2024 Matronics. All Rights Reserved.