Greggs RV-4
Work Logs Found: 74
Category Work Time: 198 Hours
 Date
Hours
Work Log Summary

Details

 12-28-2014
3.00
Worked on left wingtip and moved wings to other sh
Details
     

 12-27-2014
4.00
Right wing access panel and wingtip work.
Details
       

 12-26-2014
6.00
RH wingtip, and access panel cover.
Details
       

 12-21-2014
7.00
Finished riveting lower outboard LH wing skin, fla
Details
       

 12-11-2014
1.50
Riveting final lower outboard skin
Details

 12-07-2014
1.00
After leak checking the left fuel tank...
Details
       

 11-23-2014
5.00
Riveted on lower inboard skin on LH wing.
Details
       

 11-09-2014
1.00
Three more pics of tank from yesterday, and wing a
Details
       

 11-08-2014
6.50
Nearly finished with LH tank!
Details
       

 10-28-2014
3.50
Finished the LH fuel tank!
Details
       

 10-26-2014
5.50
LH Tank work - lots of it.
Details
       

 10-22-2014
3.00
RH Wingtip work
Details
       

 10-12-2014
3.00
Riveted on outboard skin, and temp installed tank,
Details
       

 10-10-2014
2.00
Scuffed, primed, and began riveting outboard lower
Details
       

 10-05-2014
3.50
Riveted lower inboard skin on RH wing
Details
       

 10-02-2014
1.50
Finished fabricating the access cover ring.
Details
       

 10-01-2014
1.50
Right wing prep for lower skins
Details
     

 09-24-2014
10.00
Part 3 - A LOT of RH wing/flap work today!
Details
       

 09-24-2014
0.00
Part 1 - A LOT of RH wing/flap work today!
Details
       

 11-10-2013
2.50
Work on RH tank, and LH tank ribs
Details
       

 11-09-2013
2.50
RH Fuel Tank Parts
Details
       

 11-05-2013
1.50
RH wing and fuel tank
Details
       

 11-04-2013
1.50
Working on RH tank baffle and stiffeners
Details
       

 11-03-2013
2.50
Worked on RH fuel tank
Details
       

 10-29-2013
1.00
Finished riveting leading edge, and torqued bolts
Details
       

 10-27-2013
4.00
Completed leading edge assy/ put it on the wing
Details
       

 10-25-2013
1.00
Drilled other tank baffle, and worked on leading e
Details
       

 10-20-2013
3.50
Tank ribs, leading edge
Details
       

 10-15-2013
1.00
Ruined lower skin, went back to tank parts
Details
       

 10-14-2013
1.00
Finished drilling bottom skins to the skeleton
Details
       

 10-12-2013
2.00
Fluted all tank ribs, and prepped inboard rib for
Details
       

 10-05-2013
4.00
Drilled tank stiffeners, and bottom skins
Details
       

 10-03-2013
2.50
Fabricated tank skin stiffeners and Top W-425 guss
Details
       

 10-02-2013
1.50
New Parts arrived!!
Details
       

 09-29-2013
0.50
Worked on lower outboard skin.
Details
     

 09-21-2013
6.00
Lots of progress on the leading edge today!
Details
       

 09-14-2013
4.50
Drilled leading edge to skeleton, made W-423
Details
       

 09-10-2013
1.50
Drilled (pre-punched) the leading edge skin top ha
Details
       

 09-07-2013
2.50
Worked on leading edge skin, and main top skin
Details
       

 09-02-2013
4.00
Drilled RH top skin to skeleton
Details
       

 02-09-2013
3.00
Marked the top skin for drilling, drilled holes fo
Details
       

 02-03-2013
1.50
Deburred, primed, and prepped conduit holes
Details
       

 02-02-2013
4.00
Drilled holes for conduit, located top main skin
Details
       

 01-27-2013
1.00
Preparing W-423 splice plate and leading edge skin
Details
       

 01-06-2013
3.50
Riveted rear spar, leveled and squared right win i
Details
       

 01-05-2013
2.00
Rear spar prep, moved left wing to temp. rack
Details
       

 01-04-2013
1.50
Riveted nose rib angles on, located jigging holes.
Details
       

 01-02-2013
2.00
Installed tie down, fabricated new angle
Details
       

 01-01-2013
2.50
Assembling the RH wing skeleton with perm. hardwar
Details
       

 03-18-2012
1.50
Drilled top skin to left wing
Details
       

 03-04-2012
3.00
Started on access panel, and top skin
Details
       

 03-03-2012
2.00
Completed fabrication of reinforcement ring
Details
       

 02-26-2012
2.50
Fabricated reinforcement ring, made spacer, and re
Details
       

 02-25-2012
2.50
Installing the W-425 gussetts, and working on acce
Details
       

 02-19-2012
3.50
Drilled and clecoed the lower skins to the left wi
Details
       

 02-18-2012
2.00
Marking and drilling the bottom skins
Details
       

 02-17-2012
1.50
Aligned left wing in jig
Details
       

 02-12-2012
3.00
Ran pitot line, cut sheet for top wing skins, rive
Details
       

 02-11-2012
1.00
Working on end main rib, and pitot line
Details
       

 02-03-2012
5.00
RH Aileron, RH Flap, Left wing bellcrank
Details
       

 01-28-2012
2.00
Primed parts from yesterday, and started assemblin
Details
       

 01-21-2012
1.00
Fabricating Aileron Bellcranks
Details
       

 04-10-2011
1.00
Reassembled right wing skeleton
Details
       

 04-09-2011
2.00
Primed skeleton parts for right wing
Details
       

 04-07-2011
4.00
Prepared wing parts for prime
Details
       

 03-26-2011
1.00
Built Aluminum Wing Jig/Stand
Details
       

 02-06-2011
2.50
Drilled main ribs to rear spar
Details
       

 02-01-2011
2.00
Continued on rear spar
Details
       

 01-30-2011
3.00
Building Right Rear spar
Details
       

 01-25-2011
0.50
More wing parts arrived!
Details
       

 01-10-2011
1.50
Marked flute locations
Details

 12-27-2010
1.00
Sorting pieces
Details
       

 04-04-2010
2.00
Wing Jig
Details
       

 04-04-2010
6.50
Cleaning / Scotchbriting Ribs
Details
       