KitLog pro

Powered By Kitlog Pro v2.0

Greggs RV-4
' style=
Date:  11-19-2015
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Finally riveting the ribs to the firewall and spar

This evening was spent taking care of some riveting that I had been avoiding, but time to use rivets as fasteners instead of clecos. The big floor ribs that form the tunnel between your feet were riveted to the firewall, and to the spar bulkhead. After that, I started getting some of the forward parts closer to ready for primer.
' style=

Riveted the big floor ribs to the firewall.

Riveted the big floor ribs to the firewall.

' style=

Riveted the big floor ribs to the spar bulkhead.

Riveted the big floor ribs to the spar bulkhead.

' style=

Big pile of parts to prep for primer

Big pile of parts to prep for primer

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.