KitLog pro

Powered By Kitlog Pro v2.0

Greggs RV-4
' style=
Date:  8-21-2015
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Drilling Longerons to weldmounts, and floor ribs t

I've been working a little bit the last two nights on the floor ribs, F414, and F415. Adding in the rear spar carry-through was interesting with everything in place, but not overly difficult. The tough part is holding everything in place without moving, with only two hands....

I decided tonight that I better go ahead and drill the longerons, and angled longeron, to the lower forward weldmounts. Got that done, and now I'd like to take all the floor ribs, back out, and complete the floor rib/405 and 406 bulkhead assembly, so that I can finish riveting it together. There are a few things that I noticed tonight, that I simply cannot find measurements/rivet callouts for. Nose is in the drawings tonight!
' style=

Drilling floor ribs to spar bulkhead

Drilling floor ribs to spar bulkhead

' style=

Lower right weldmount

Lower right weldmount

' style=

Lower left weldmount

Lower left weldmount

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.