KitLog pro

Powered By Kitlog Pro v2.0

Greggs RV-4
' style=
Date:  10-21-2015
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Drilling and shaping the four forward skins

Lots of work done over the course of the last several days, led to this; The canoe is 99% drilled!
The right side skins are completely drilled, and the left skins are close to finished. All four skins needed material cut off, and since these are lines that will be seen forever, I took them to my neighbor's hangar and used his stomp shear.
' style=

Right side skins are drilled.

Right side skins are drilled.

' style=

Left side skins are being drilled.

Left side skins are being drilled.

' style=

Looking pretty cool in here!

Looking pretty cool in here!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.