KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  12-27-2010
Number of Hours:  2.25
Manual Reference:  
Brief Description:  wire connectors at rudder-VS gap

We'll see how this works out...can't tell if it will bind...don't think so. May need to anchor wires down inside VS cuff.

Looped rudder trim wire up then down to the holes in the VS; looped strobe and nav wires down to holes in VS. Did this to try to mitigate any crowding of the wires and connectors.
' style=

at aft light - strobe and position light

at aft light - strobe and position light

' style=

strobe & nav on 1 mini molex

strobe & nav on 1 mini molex

' style=

rudder trim on another 6 pin mini molex

rudder trim on another 6 pin mini molex

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.