KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
< Previous Log Entry          Next Log Entry >
' style=
Date:  1-28-2012
Number of Hours:  3.25
Manual Reference:  
Brief Description:  bond preheat to oil pan; safety cylinder bands

Took advantage of a 50+ degree day in January to bond Reiff sump preheat element to oil pan

Secure wires; RTV (red) wiring harness to induction tubes; RTV grommet in rear baffle.

Thanks to Gary Casey from the ES group for the idea on how to safety the bands.. not exactly what he suggested, but he got me thinking in the right direction
' style=

sump element bonded on; ran portable heat all night

sump element bonded on; ran portable heat all night

' style=

safetied all cylinder bands

safetied all cylinder bands

' style=

# 2 was very difficult..did best I could

# 2 was very difficult..did best I could

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.