KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  8-2-2010
Number of Hours:  2.50
Manual Reference:  
Brief Description:  rought run CHT-EGT wires; install probes

Used anti-seize compound on CHT probes; torqued to 25 #/in.

Probes have faston tab connectors already applied. Harness by Stein Air via AFS. Will apply tabs to wire ends next week.

Defer securing to mount, etc with adel clamps until engine is final hung at airport. This way I can pull wire tabs and drop engine to transport separately.

Changed descicant plugs again...been very humid. Took all of old silica home to recharge in oven.
' style=

left side  2-4-6; yellow is EGT

left side 2-4-6; yellow is EGT

' style=

brown wires are CHT/EGT harness

brown wires are CHT/EGT harness

' style=

right side 1-3-5

right side 1-3-5

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.