KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  7-19-2010
Number of Hours:  5.00
Manual Reference:  
Brief Description:  plan and run conduits and grommets

Plan all wire runs and conduit/grommets needed
drill and grind to fit

Lots of head scratching but came up with a plan I think will work
' style=

add PVC (3/4

add PVC (3/4") conduits for wire runs each side

' style=

left side signal cables run to the middle to go rear

left side signal cables run to the middle to go rear

' style=

conduit in elev torque tube tunnel

conduit in elev torque tube tunnel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.