KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  4-4-2009
Number of Hours:  1.75
Manual Reference:  
Brief Description:  trim and prep rudder; remove clecos; release tape

had two #2050 fairings like pci #2. Need 2 for aileron push tubes, one for rudder trim tab, one for elevator trim tab and a 5th for the aileron trim tab
Used one of the Lancair provided 2050 fairings, added release tape, then will 2 BID...will repeat two more times to get me 5 fairings in total
' style=

trimmed rudder to final size, then prepped for 2 BIDs, etc

trimmed rudder to final size, then prepped for 2 BIDs, etc

' style=

fabricate add'l fairing

fabricate add'l fairing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.