KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  8-17-2008
Number of Hours:  2.75
Manual Reference:  
Brief Description:  add nutplates to left fairing, flox

trim flange; pop off blocks that aligned 2 parts; add nutplates to 4 BID flange..every 3 inches
fit top, add temp. screws to ensure alignment when floxed
' style=

fkange before trimming

fkange before trimming

' style=




' style=

other side

other side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.