Powered By Kitlog Pro v2.0
N144GP Lancair Super ES
Lancair Super ES
Fuselage
8-16-2009
< Previous Log Entry
Next Log Entry >
Date:
8-16-2009
Number of Hours:
2.00
Manual Reference:
Brief Description:
sanded and Super-filled left side of fuselage...mo
Turned fuselage 45 degrees on the rotissiere and sanded around wing fairing mostly. Added Super-fil coat #1.
Too hot to work outside, so I spent time on this.
1 person can easily turn it. Thanks Ed, Bob and Bill!
rotisserie works great!
hung HS from rafters to get it out of the way until ready for bonding (and panel mock up)
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Lightning (EAB-LSA) Home
Lancair Super ES Home
Category
# Logs
# Hours
All
1827
4433
Avionics
113
163
Bodywork - misc.
10
25
Electrical
23
36
Elevators
15
60
Empennage
27
28
Engine
33
86
Firewall forward
77
163
Flying - test flying
29
94
Fuselage
633
1070
Garmin 3X Touch pane
139
256
Garmin GMC 507 Autop
18
35
Gear and wheels
102
196
Horizontal Stab
75
148
Interior
7
18
Miscellaneous
128
298
Move
15
60
Paint
1
973
Prop
7
13
Research, prep shop,
1
1
Speed Brakes
22
25
Vert Stab - Rudder
136
166
Wings
163
393
Wiring
53
126
Copyright © 2001-2024 Matronics. All Rights Reserved.