Brief Description: pop bellcrank bolt off; redrill hole
had originally floxed bolt to phenolic pad for bellcrank. That will make it nearly impossible to attach rudder tubes and to mount all that to platform. Used heat gun and a hammer to pop off bolt. Used step drill to drill out clearance hoel to 11/16" to accept 1/2" socket. This way I can attach rudder tubes to bellcrank arm and then slide the whole assembly to the phenolic pad and bolt in place. Should work out much easier this way. Will also let me put bolt head down through rod end to provide proper clearance, with washer and nut on top