KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  1-24-2009
Number of Hours:  2.50
Manual Reference:  
Brief Description:  fuel tunnel and floorboards

trimmed fuel tunnel flange and drilled holes into cap strip in vertical support for floor boards; decided to use rivnuts for this as well, easier, and not really structural... I'm really liking these rivnuts and will be using them more often.

8-32 cad plated steel for the thinnest material size

Prepped and micro'd transition form floorbaords to fuselage
' style=

rivnuts on capstrips

rivnuts on capstrips

' style=

1st layer of micro

1st layer of micro

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.