KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  12-27-2008
Number of Hours:  1.25
Manual Reference:  
Brief Description:  2 BID top of fuel line tunnel

90 degree 2 BID to top of fuel line tunnel...needed to babysit it alot to ensure the corner was tight and the bubbles were out; pulled peel ply off later on and it looked very goof
' style=

2 BID to top

2 BID to top

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.