Brief Description: design & fabricate fuel line tunnel
design, fit and cut fuel line tunnel pieces tunnel will be fastened to floorboards with 3 bolts/nutplates per side that will go through a flange on the tunnel, through the floor, into nutplates in the capstrip on the vertical support May need a click bond stud on the aft end...each side. Will add as necessary
May need a fastener at forward, outbaord corner of each floorboard. Will add as necessary, probably by floxing a platform and bonding a click bond stud on flox pad.