KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  12-21-2008
Number of Hours:  2.50
Manual Reference:  
Brief Description:  design & fabricate fuel line tunnel

design, fit and cut fuel line tunnel pieces
tunnel will be fastened to floorboards with 3 bolts/nutplates per side that will go through a flange on the tunnel, through the floor, into nutplates in the capstrip on the vertical support
May need a click bond stud on the aft end...each side. Will add as necessary

May need a fastener at forward, outbaord corner of each floorboard. Will add as necessary, probably by floxing a platform and bonding a click bond stud on flox pad.
' style=

top layed in place

top layed in place

' style=

side view; top only, side panels not shown

side view; top only, side panels not shown

' style=

note hole for fuel selector knob

note hole for fuel selector knob

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.