KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  11-23-2008
Number of Hours:  0.50
Manual Reference:  
Brief Description:  add 6 click-bond studs to hold fuel lines

these click-bonds are very cool. Easy to work with and finish nicely. Pricey... about $4 a piece I think, but sure beats making the phenolic block etc.
Epoxy turns green when cured...very fast 5-7 minute working time.
6 studs in a pack with only one epoxy packet, so you have to use all sic at once.
Gonna order another set...will sure to need them for cables, etc.

Need to get some #10 and #12 adel clamps. #8s work good for return line but need a bigger clamp for supply line. Will check hangar or roder some.
' style=

lines from fuel selector to pump

lines from fuel selector to pump

' style=

selector to wing

selector to wing

' style=

supply line from pump to gascolator on firewall

supply line from pump to gascolator on firewall

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.