Brief Description: install nutplates with rivets - 6 places
Worked out well, except it was hard to set the aft most rivets as the handle on the squeezer was too long to fit between the fuselage and the tunnel. Fooled with it and made it work.
with screw shown that attaches cover to tube tunnel