KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  3-3-2012
Number of Hours:  5.25
Manual Reference:  
Brief Description:  misc. tasks; condition inspection

clean up shop; sort out extension cords, etc.

trim glareshield where modified to fit in panel; clean up...no paint...will need to paint next time

check VR #1 and VR #2 wiring to B&C drawings....all correct. red to terminal 6 on each, black to 7 on each; white to #4 on VR1 and #5 on VR2

modify aft seat cover by enlarging holes; add 4th bolts to each seat bottom; need to enlarge holes in seat bottoms - need to remove both seats to do; trim aft panel for clearance for 4th bolts

fabricate alum. bracket to secure top of left side interior panels at pilot shoulder - need to add one more rivnut and screw hole

review and complete 1st conditional inspection form 3-3-12... only outstanding item is W&B that is scheduled for 3/12/12 with Duncan; lubrIcate all bearings with LPS2
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.