KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  9-17-2012
Number of Hours:  3.75
Manual Reference:  
Brief Description:  1 BID to COM belly antenna copper strips

prep and add 1 BID to belly antenna copper strips, peel ply. Messy doing it upside down!

inspect AP pitch servo and elevator torque tube and rod ends. Inspect all aileron tubes and rod ends as well as roll servo. Doing condition inspection while down for engine reapir.

replace lower pilot side AN365A-720 nut for engine mount (Had bottomed this one out and re-tapped it. Easy to replace while interior is out and engine off. Torque to 45# (40+5 due to torquing from bolt side)

re-install interior side panelsl and seats

Clean up windows and visors and glare shield. Put cover back on.
' style=

1 BID applied, peel ply pulled off

1 BID applied, peel ply pulled off

' style=

brushed epoxy on then added 1 BID, then peel ply

brushed epoxy on then added 1 BID, then peel ply

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.