N144GP Lancair Super ES
' style=
Date:  12-20-2007
Number of Hours:  2.00
Manual Reference:  
Brief Description:  finish up elevator BIDs
' style=

2 BID 5 1/2 X 6 inboard end of each elevator

2 BID 5 1/2 X 6 inboard end of each elevator

' style=

rasp out hole to access bolt to remove elevator hardware...be sure to torque these back down

rasp out hole to access bolt to remove elevator hardware...be sure to torque these back down

' style=

2 BID on weight end of elevator

2 BID on weight end of elevator

' style=