KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  8-2-2018
Number of Hours:  2.25
Manual Reference:  
Brief Description:  SB; work on wiring

A lot of head scratching time. Pulled plate I made to cover the two ALT CBs at top, that Aerotronics put in by mistake. (already have ANL fuses on those circuits). Remade the plate twice and painted. I am using the L (from the front) old ALT breaker hole for the new 3A CB for speed brakes. Precise Flight includes the CB in the kit. Remade plate that will cover R side hole.

Pull R side G3X to get access to run the power wire to the buss and the new breaker.

Going to be tough working back there, but do-able, but will that save for a day when I am fresh. Would be a good idea to provide access to CB panel that you can actually get to.

RTV applied to holes I added to run cables.

Marked placement of SB switch and 24V green LED annuciator light.
' style=

will tap buss at bottom of top left breaker

will tap buss at bottom of top left breaker

' style=

side view of left top breaker

side view of left top breaker

' style=

New 3A CB will go to R hole

New 3A CB will go to R hole

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.