KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
' style=
Date:  12-24-2016
Number of Hours:  3.50
Manual Reference:  
Brief Description:  rang out 3 RG400 lines; run new wire, vac.

no pics
Torqued engine mount bolts to 40#. 3 of 5 were not quite snug... maybe 1/2 turn. Easy to do with panel out. Insulation compresses on FW. This is 3rd pass... should be good now. Also torqued/snugged all spar and various bracket bolts.
Rang out 3 runs of RG400.. labeled A-B-C. A to belly ant. area. B to fuselage ant. area. A and B could go to either belly or fuse antennae. C is run to VS with 1 connection in aft panel area at ELT.
Old VP main power wire is 6g and coiled up in co-pilot footwell. Essential buss wire to old fuse panel is 10g. Coiled in same area. Will leave as is until new panel is done and see what I need.
Ran C wire, RG-400 wire through conduits, etc. Put new BNC on end. Metered out... good.
Vacumned everything and wiped down all tubes and pushrods. Lots of sanding dust from paint visit at Brad's.
' style=

A-B-C notes

A-B-C notes

' style=

old fuse panel power 10g

old fuse panel power 10g

' style=

terrible pic!  6g main power

terrible pic! 6g main power

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.