Date
|
Hours
|
Work Log Summary

|
Details

|
03-05-2023
|
5.00
|
finished left wingtip
|
Details
|
|
|
02-27-2023
|
3.00
|
right wingtip final rivetting
|
Details
|
|
|
02-25-2023
|
10.00
|
left wing tip final rivetting
|
Details
|
|
|
02-24-2023
|
9.00
|
left wingtip finishing touches
|
Details
|
|
|
02-22-2023
|
9.00
|
right wingtip nearly done
|
Details
|
|
|
02-21-2023
|
6.00
|
right wing tip
|
Details
|
|
|
01-25-2023
|
8.00
|
mounted wings fuselage
|
Details
|
|
|
10-05-2019
|
5.00
|
reassembled wings to center section
|
Details
|
|
|
09-25-2019
|
10.00
|
left wingtip coming along well
|
Details
|
|
|
09-24-2019
|
3.00
|
preparing skins for left wing tip
|
Details
|
|
|
09-24-2019
|
3.00
|
continuing good progress on left wingtip
|
Details
|
|
|
09-23-2019
|
8.00
|
good progress on right wingtip
|
Details
|
|
|
09-19-2019
|
5.00
|
top and bottom skins, trailing edge temporarily in
|
Details
|
|
|
09-18-2019
|
10.00
|
fitting wingtip skins, leading edge and trailing e
|
Details
|
 |
|
09-17-2019
|
8.00
|
riveted right wingtip spar to right main spar
|
Details
|
|
|
09-16-2019
|
8.00
|
forming ribs and spars
|
Details
|
|
|
09-15-2019
|
5.00
|
finished initial work on center section, setting u
|
Details
|
|
|
09-13-2019
|
4.00
|
left aileron completed and hung on wing
|
Details
|
|
|
09-12-2019
|
5.00
|
right aileron completed and hung on wing
|
Details
|
|
|
09-05-2019
|
6.00
|
forming and test fitting seat ribs
|
Details
|
|
|
09-03-2019
|
5.00
|
cut out blanks for center section seat ribs
|
Details
|
|
|
09-02-2019
|
5.00
|
seat rib fabrication
|
Details
|
|
|
09-01-2019
|
3.00
|
installed aft spar carry-through
|
Details
|
|
|
09-01-2019
|
3.00
|
aileron belcrank stops
|
Details
|
|
|
08-31-2019
|
1.00
|
set up a nice level table for center section build
|
Details
|
|
|
08-31-2019
|
3.00
|
hung right aileron on right wing
|
Details
|
|
|
08-28-2019
|
4.00
|
attached left aileron to left wing
|
Details
|
|
|
08-27-2019
|
5.00
|
good progress on the ailerons
|
Details
|
|
|
08-26-2019
|
6.00
|
final riveting on right wing
|
Details
|
|
|
08-25-2019
|
4.00
|
positioning aileron horns on right aileron
|
Details
|
|
|
08-22-2019
|
4.00
|
aileron hinge preparation and aileron horn blank c
|
Details
|
|
|
08-21-2019
|
4.00
|
riveting right wing
|
Details
|
|
|
08-20-2019
|
4.00
|
install aileron control belcrank for right wing
|
Details
|
|
|
08-19-2019
|
9.00
|
right wing final drilling and deburring
|
Details
|
|
|
08-07-2019
|
2.00
|
received fiberglass wing tips and elevator tips
|
Details
|
|
|
08-06-2019
|
2.00
|
ailerons
|
Details
|
|
|
09-10-2013
|
5.00
|
aileron fabrication
|
Details
|
|
|
09-08-2013
|
5.00
|
aileron fabrication
|
Details
|
|
|
09-03-2013
|
3.00
|
workspace organizing and parts ordering
|
Details
|
 |
|
09-02-2013
|
6.00
|
buildt an assembly table for the hangar at the air
|
Details
|
|
|
08-24-2013
|
3.00
|
first bends on aileron skins
|
Details
|
|
|
08-21-2013
|
2.00
|
ailerons preparation
|
Details
|
  |
|
05-10-2011
|
2.00
|
reassembled and inverted wing
|
Details
|
  |
|
05-08-2011
|
6.00
|
drilling and clecoing along top spar line
|
Details
|
  |
|
04-21-2011
|
2.00
|
more rivets into the bottom skins
|
Details
|
  |
|
04-20-2011
|
8.00
|
started assembling right wing
|
Details
|
  |
|
04-18-2011
|
1.00
|
marking bend lines on bottom skins of right wing
|
Details
|
  |
|
04-15-2011
|
8.00
|
riveting spar line and fabricating tip spar
|
Details
|
  |
|
04-03-2011
|
6.00
|
cutting 0.020 sheet metal for wing tips and other
|
Details
|
  |
|
03-31-2011
|
4.00
|
drilling and riveting remaining spar rivets
|
Details
|
  |
|
03-30-2011
|
4.00
|
riveting left wing top skins
|
Details
|
  |
|
03-29-2011
|
4.00
|
wing skin deburring
|
Details
|
  |
|
03-28-2011
|
4.00
|
wing skin drilling
|
Details
|
  |
|
03-27-2011
|
8.00
|
top left wing skins
|
Details
|
  |
|
03-21-2011
|
6.00
|
rivet bottom skins to ribs
|
Details
|
  |
|
03-20-2011
|
4.00
|
up drilled rivet holes to # 30
|
Details
|
  |
|
03-19-2011
|
8.00
|
stiffener channel for pitot static tubes
|
Details
|
  |
|
03-16-2011
|
2.00
|
wing skin bending
|
Details
|
  |
|
03-12-2011
|
4.00
|
installed second tie-down ring anchor nut
|
Details
|
  |
|
03-11-2011
|
4.00
|
tie down ring anchor nut
|
Details
|
  |
|
02-01-2011
|
3.00
|
shaping wing root rib and aileron belcrank mount
|
Details
|
|
|
01-30-2011
|
6.00
|
0.020 main ribs attached to left wing
|
Details
|
|
|
01-22-2011
|
2.00
|
riveting leading edge skin left wing
|
Details
|
|
|
01-21-2011
|
4.00
|
up-drill holes in skin and ribs
|
Details
|
|
|
01-19-2011
|
9.00
|
ribs on spar, skin on ribs
|
Details
|
|
|
01-18-2011
|
1.00
|
drawing stripes on ribs
|
Details
|
|
|
01-17-2011
|
2.00
|
riveting on leading edge skins
|
Details
|
|
|
01-15-2011
|
2.00
|
indentations in aft wing ribs
|
Details
|
|
|
01-11-2011
|
8.00
|
Enlarge rivet holes and begin riveting
|
Details
|
|
|
01-09-2011
|
8.00
|
problems fitting leadindg edge
|
Details
|
|
|
01-08-2011
|
6.00
|
Drilled and clecoed upper surface LE
|
Details
|
|
|
01-07-2011
|
8.00
|
drilled and clecoed end ribs
|
Details
|
 |
|
01-06-2011
|
4.00
|
Trial fitting of leading edge skin to ribs
|
Details
|
|
|
01-05-2011
|
6.00
|
attach nose ribs to right spar
|
Details
|
|
|
01-04-2011
|
4.00
|
Aileron control bellcranks
|
Details
|
|
|
01-03-2011
|
1.00
|
Vacuum forming preparations
|
Details
|
|
|
01-03-2011
|
1.00
|
Vacuum forming complete
|
Details
|
|
|
01-03-2011
|
3.00
|
Polish wing leading edge
|
Details
|
|
|
01-03-2011
|
3.00
|
Leading Edge Polish
|
Details
|
|
|
01-01-2011
|
3.00
|
vacuum forming the wing leading edge
|
Details
|
|
|
01-01-2011
|
4.00
|
polishing wing leading edges
|
Details
|
|
|
01-01-2011
|
4.00
|
polishing leading edges
|
Details
|
|
|
12-29-2010
|
8.00
|
final shaping of wing attach fittings
|
Details
|
|
|
12-26-2010
|
8.00
|
aileron belcranks
|
Details
|
|
|
12-19-2010
|
1.00
|
leading edge skin bending prep
|
Details
|
|
|
12-18-2010
|
8.00
|
step drill wing attach bolt holes
|
Details
|
|
|
12-16-2010
|
3.00
|
aileron belcranks
|
Details
|
|
|
12-15-2010
|
4.00
|
drilled out one of the half-inch holes in wing mou
|
Details
|
  |
|
12-08-2010
|
8.00
|
rib forming
|
Details
|
  |
|
12-06-2010
|
4.00
|
rib forming
|
Details
|
  |
|
12-04-2010
|
6.00
|
recovered from the drill bit snapped in the hole
|
Details
|
  |
|
12-04-2010
|
3.00
|
cut out wing rib blanks
|
Details
|
  |
|
12-03-2010
|
6.00
|
snapped a drill bit in center spar
|
Details
|
  |
|
12-03-2010
|
3.00
|
hand forming nose ribs to final shape
|
Details
|
  |
|
11-29-2010
|
3.00
|
nose rib fine tuning
|
Details
|
  |
|
11-29-2010
|
6.00
|
finished spar trim and set dihedral right wing
|
Details
|
|
|
11-28-2010
|
4.00
|
trimming and shaping right wing root
|
Details
|
|
|
11-28-2010
|
4.00
|
cut out leading edge skins and trace ribs
|
Details
|
|
|
11-27-2010
|
3.00
|
flange lightening holes in 9 nose ribs
|
Details
|
|
|
11-26-2010
|
3.00
|
cut the lightening holes in the nose ribs
|
Details
|
|
|
11-23-2010
|
6.00
|
hammer edge flanges into nose rib blanks
|
Details
|
|
|
11-22-2010
|
4.00
|
final shaping of nose rib blanks
|
Details
|
|
|
11-09-2010
|
2.00
|
cutting out nose rib blanks
|
Details
|
  |
|
11-07-2010
|
8.00
|
left wing dihedral setting
|
Details
|
|
|
11-06-2010
|
8.00
|
clearance adjust at wing root
|
Details
|
|
|
11-05-2010
|
4.00
|
finish drilling and replacing mis-set rivets
|
Details
|
|
|
11-05-2010
|
4.00
|
dihedral setting
|
Details
|
|
|
11-04-2010
|
3.00
|
riveting spars
|
Details
|
  |
|
11-03-2010
|
3.00
|
spar riveting
|
|
  |
|
11-02-2010
|
3.00
|
spar riveting
|
|
  |
|
11-01-2010
|
2.00
|
spar riveting
|
|
  |
|
10-30-2010
|
8.00
|
spar riveting revision to method
|
Details
|
|
|
10-29-2010
|
8.00
|
riveting on spars
|
|
  |
|
10-26-2010
|
4.00
|
riveting on spars
|
|
  |
|
10-25-2010
|
4.00
|
riveting on spars
|
|
  |
|
10-24-2010
|
10.00
|
riveting on spars
|
Details
|
|
|
10-23-2010
|
8.00
|
began riveting on center section spar
|
Details
|
|
|
10-22-2010
|
4.00
|
final preparations for riveting spars
|
Details
|
|
|
10-18-2010
|
4.00
|
mounting and using the arbor press
|
Details
|
|
|
10-17-2010
|
8.00
|
consultations and form block borrowing
|
Details
|
  |
|
10-16-2010
|
6.00
|
rivet practice & bucking bar manufacturing
|
Details
|
  |
|
10-15-2010
|
2.00
|
inspection
|
Details
|
  |
|
10-15-2010
|
4.00
|
cleaning up spars for inspection
|
Details
|
  |
|
10-14-2010
|
3.00
|
details on center section
|
Details
|
  |
|
10-13-2010
|
4.00
|
steel work on center section
|
Details
|
|
|
10-13-2010
|
3.00
|
making my third riveting practice piece
|
Details
|
|
|
10-12-2010
|
3.00
|
steel work on center section
|
Details
|
|
|
10-11-2010
|
5.00
|
steel work on center section
|
Details
|
|
|
10-11-2010
|
2.00
|
finish steel work on left spar
|
Details
|
|
|
10-10-2010
|
3.00
|
drive the rivets into practice piece
|
Details
|
|
|
10-09-2010
|
8.00
|
working on left wing spar
|
Details
|
|
|
10-09-2010
|
2.00
|
practice piece for solid rivets in spars
|
Details
|
|
|
10-08-2010
|
8.00
|
tape rivets in spar caps for inspection
|
Details
|
|
|
10-07-2010
|
4.00
|
debur and reassemble right spar
|
Details
|
|
|
10-06-2010
|
3.00
|
finish steel work on right spar
|
Details
|
|
|
10-05-2010
|
8.00
|
add 4130 plates to wing root spar caps
|
Details
|
|
|
10-04-2010
|
8.00
|
a better fixture for rib angle attachment
|
Details
|
|
|
10-03-2010
|
8.00
|
add rib attach angles to spar
|
Details
|
|
|
10-02-2010
|
4.00
|
match drill rib attach angles for center spar
|
Details
|
|
|
10-02-2010
|
4.00
|
debur right spar
|
Details
|
|
|
10-01-2010
|
4.00
|
rivet bucking practice
|
Details
|
|
|
09-30-2010
|
5.00
|
drilled rivet holes in right spar
|
Details
|
|
|
09-29-2010
|
4.00
|
second spar clamped for drilling
|
Details
|
|
|
09-27-2010
|
2.00
|
still polishing out the big bad scratch
|
Details
|
|
|
09-27-2010
|
7.00
|
layout and predrill rivet holes in right spar caps
|
Details
|
|
|
09-26-2010
|
3.00
|
finish drilling and clecoing rivet holes in left s
|
Details
|
|
|
09-26-2010
|
4.00
|
debur & polish spar web
|
Details
|
|
|
09-26-2010
|
1.00
|
bad mistake due to rushing
|
Details
|
|
|
09-25-2010
|
12.00
|
spar assembly
|
Details
|
|
|
09-25-2010
|
1.00
|
setup for drilling rivet holes
|
Details
|
|
|
09-24-2010
|
4.00
|
spar cap finishing
|
Details
|
|
|
09-24-2010
|
6.00
|
more spar cap finishing
|
Details
|
|
|
09-23-2010
|
4.00
|
prepare center section for riveting
|
Details
|
|
|
09-22-2010
|
8.00
|
priming 4130 reinforcing plates
|
Details
|
|
|
09-20-2010
|
8.00
|
center section spar carrythrough
|
Details
|
|
|
09-19-2010
|
6.00
|
center section spar carry-through
|
Details
|
|
|
09-18-2010
|
4.00
|
rivet cutting
|
Details
|
|
|
09-17-2010
|
2.00
|
test section spar simulator
|
Details
|
|
|
09-17-2010
|
2.00
|
practicing with the rivet squeezer
|
Details
|
|
|
09-14-2010
|
2.00
|
polished components of center section
|
Details
|
|
|
09-12-2010
|
4.00
|
wing rib attachment angles cutout
|
Details
|
|
|
09-12-2010
|
4.00
|
spar caps intermediate shaping
|
Details
|
|
|
09-10-2010
|
5.00
|
rough cutout of last 4130 plate, sixth taper cut s
|
Details
|
|
|
09-09-2010
|
4.00
|
another 4130 reinforcing plate and 12 angles
|
Details
|
|
|
09-06-2010
|
3.00
|
reinforcing plates of 4130 steel
|
Details
|
|
|
09-04-2010
|
8.00
|
debur and polish edges of spar webs
|
Details
|
|
|
09-03-2010
|
4.00
|
cut out spar webs
|
Details
|
|
|
09-01-2010
|
2.00
|
fifth taper cut on spar cap
|
Details
|
|
|
08-28-2010
|
3.00
|
4130 steel for wing attach fittings
|
Details
|
|
|
08-22-2010
|
3.00
|
fourth taper cut on spar cap plus spacers
|
Details
|
|
|
08-21-2010
|
3.00
|
third taper cut on spar cap plus spacer cutout
|
Details
|
|
|
08-20-2010
|
2.00
|
second taper cut on spar cap
|
Details
|
|
|
08-19-2010
|
2.00
|
first taper cut on spar cap
|
Details
|
|