Date
|
Hours
|
Work Log Summary

|
Details

|
03-26-2019
|
0.00
|
Pictures of center tunnel completed
|
Details
|
|
|
03-09-2019
|
5.00
|
Finished installing defrost fans
|
Details
|
|
|
03-03-2019
|
3.00
|
Cutting holes for defrost fans
|
Details
|
|
|
02-09-2019
|
40.00
|
Wire lacing/Tye wrapping
|
Details
|
  |
|
11-15-2018
|
2.00
|
Lacing vertical section of center tunnel
|
Details
|
|
|
10-28-2018
|
40.00
|
Dynon configurations
|
Details
|
  |
|
09-30-2018
|
8.00
|
Configuring avionics
|
Details
|
  |
|
09-29-2018
|
7.00
|
Dynon backup batteries
|
Details
|
|
|
09-28-2018
|
4.00
|
Installed manifold pressure lines
|
Details
|
 |
|
09-23-2018
|
16.00
|
Powered up the avionic panel
|
Details
|
 |
|
09-09-2018
|
8.00
|
Wiring avionics
|
Details
|
  |
|
09-08-2018
|
8.00
|
Worked on avionics
|
Details
|
  |
|
09-07-2018
|
2.00
|
Right side of VPX completed
|
Details
|
|
|
09-06-2018
|
2.00
|
Installed J1 on VPX
|
Details
|
|
|
08-26-2018
|
5.00
|
Installing the avionic wiring harness
|
Details
|
 |
|
08-26-2018
|
3.00
|
Completed wiring harness
|
Details
|
 |
|
08-23-2018
|
4.00
|
Finished Garmin connectors
|
Details
|
|
|
08-21-2018
|
8.00
|
More work on the wiring harness
|
Details
|
|
|
08-18-2018
|
8.00
|
Worked on avionics wiring harness
|
|
  |
|
08-08-2018
|
1.00
|
Remounted ELT buzzer
|
Details
|
|
|
08-07-2018
|
4.00
|
Worked on wiring harnesses
|
Details
|
  |
|
08-05-2018
|
5.00
|
Building Skyview Y harness
|
Details
|
|
|
08-04-2018
|
8.00
|
Working on main wiring harness
|
Details
|
|
|
07-30-2018
|
3.00
|
Avionics wiring
|
Details
|
|
|
07-28-2018
|
1.00
|
Installed ELT audio alert
|
Details
|
 |
|
07-28-2018
|
2.00
|
Installed ADSB 472
|
Details
|
 |
|
07-21-2018
|
2.00
|
Installed charging fuses
|
Details
|
|
|
07-14-2018
|
1.00
|
Installed EarthX trouble lights
|
Details
|
 |
|
07-13-2018
|
40.00
|
Time spent running wiring
|
Details
|
  |
|
07-13-2018
|
2.00
|
Accessory batteries for the ACK ELT
|
Details
|
 |
|
06-17-2018
|
20.00
|
Flap motor wiring
|
Details
|
|
|
06-10-2018
|
3.00
|
Wired Battery and Fuel selector switch
|
Details
|
 |
|
05-26-2018
|
40.00
|
Wiring aircraft
|
Details
|
|
|
04-09-2018
|
5.00
|
Installed manifold pressure sensors
|
Details
|
|
|
08-25-2017
|
4.00
|
Modified GPS mounts
|
Details
|
|
|
07-05-2017
|
4.00
|
Finished heat shield on center wire bundle
|
Details
|
|
|
07-05-2017
|
0.00
|
Additional pictures of the center tunnel heat shie
|
|
|
|
07-04-2017
|
2.00
|
Wiring in forward center tunnel
|
Details
|
|
|
07-04-2017
|
4.00
|
Running wire from rear of aircraft through wing sp
|
Details
|
|
|
07-02-2017
|
2.00
|
Installed COM antennas
|
Details
|
|
|
07-01-2017
|
1.00
|
Installed GPS receivers
|
Details
|
|
|
06-27-2017
|
0.00
|
test
|
|
  |
|
06-24-2017
|
6.00
|
Installing GPS receivers under cowl
|
Details
|
|
|
06-20-2017
|
0.50
|
Installed filter on alt static air
|
Details
|
 |
|
06-19-2017
|
2.00
|
HDX backup batteries
|
Details
|
|
|
06-18-2017
|
2.00
|
Installed the SV-EMS-220
|
Details
|
 |
|
06-04-2017
|
3.00
|
Alternate static air
|
Details
|
|
|
06-03-2017
|
5.00
|
Static and dynamic test ports
|
Details
|
|
|
05-30-2017
|
2.00
|
Installed avionics
|
Details
|
|
|
05-21-2017
|
6.00
|
Installing avionics
|
Details
|
|
|
05-20-2017
|
4.00
|
Installed instrument panel
|
Details
|
|
|
05-12-2017
|
1.00
|
Fabricated circuit breaker bus bar
|
Details
|
 |
|
05-08-2017
|
3.00
|
Building Garmin stack
|
Details
|
|
|
05-07-2017
|
1.00
|
Installed panel
|
Details
|
 |
|
04-29-2017
|
4.00
|
Installed secondary ADAHRS
|
Details
|
|
|
04-15-2017
|
8.00
|
Installed Vertical Power and Bus Manager
|
Details
|
|
|
03-19-2017
|
3.00
|
Repainting the instrument panel
|
Details
|
  |
|
03-12-2017
|
7.00
|
Instrument panel painted
|
Details
|
|
|
03-11-2017
|
8.00
|
Instrument Panel ready for painting
|
Details
|
|
|
12-15-2016
|
24.00
|
Instrument panel template
|
Details
|
|
|
01-01-2016
|
2.00
|
Updated the avionics drawings
|
|
  |
|
01-01-2016
|
4.00
|
Finished all wiring behind the baggage bulkhead
|
Details
|
|
|
12-31-2015
|
8.00
|
Worked on avionics and ELT
|
Details
|
|
|
12-24-2015
|
1.00
|
Pulled wire from empennage to front of aircraft
|
Details
|
|
|
12-23-2015
|
8.00
|
Wiring empennage
|
Details
|
  |
|
12-22-2015
|
8.00
|
Wiring empennage
|
Details
|
  |
|
12-21-2015
|
1.00
|
Finished Skyview network cable
|
Details
|
|
|
12-20-2015
|
2.00
|
Skyview Network Harness
|
Details
|
  |
|
12-20-2015
|
3.00
|
ELT wiring harness
|
Details
|
 |
|
12-18-2015
|
2.00
|
Finished installation of ADARHS
|
Details
|
|
|
12-12-2015
|
8.00
|
Finished transponder and ADSB receiver harness
|
Details
|
 |
|
12-11-2015
|
2.00
|
Transponder avionics harness
|
Details
|
|
|
12-10-2015
|
2.00
|
Worked on wiring
|
Details
|
  |
|
12-08-2015
|
3.00
|
Wiring in empennage
|
Details
|
|
|
12-06-2015
|
3.00
|
Wiring harnes in rear empennage
|
Details
|
|
|
11-29-2015
|
2.00
|
Mounted rear avionics
|
Details
|
|
|
11-28-2015
|
2.00
|
Worked on rear avionics tray
|
Details
|
  |
|
11-28-2015
|
1.00
|
Installed transponder and ADSB antennas
|
Details
|
|
|
11-27-2015
|
8.00
|
Fabricated rear avionic shelf
|
Details
|
|
|
11-22-2015
|
3.00
|
ADAHRS wire loom
|
Details
|
 |
|
11-21-2015
|
4.00
|
Redid wiring to the pitch servo
|
Details
|
 |
|
11-16-2015
|
1.00
|
Installed electrical connector
|
Details
|
 |
|
11-05-2015
|
3.00
|
Installed OAT and made wiring harness
|
Details
|
|
|
11-01-2015
|
6.00
|
Installed ADAHRS bracket and static line
|
Details
|
|
|
10-31-2015
|
5.00
|
Started ADAHRS bracket
|
Details
|
|
|
10-29-2015
|
3.00
|
Worked on electrical schematics
|
Details
|
  |
|
10-28-2015
|
3.00
|
Worked on electrical schematics
|
Details
|
  |
|
12-27-2014
|
8.00
|
Roll servo completed
|
Details
|
|
|
12-26-2014
|
6.00
|
Roll servo installation
|
Details
|
|
|
12-24-2014
|
1.00
|
Installed limit stop and safety wire on elev servo
|
Details
|
 |
|
12-23-2014
|
5.00
|
Installed elevator autopilot servo
|
Details
|
|