Date
  | 
	Hours
  | 
	Work Log Summary 
		 
  | 
	Details 
		 
  | 
	
		
	
	 06-25-2021
  | 
	1.00
  | 
	Rivet on nutplates for the empennage fairing
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-23-2021
  | 
	1.50
  | 
	Drill rivets for nut plates and mount Click-Bond n
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-07-2021
  | 
	2.00
  | 
	Alignment of wing tip edges to aileron edges
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-02-2021
  | 
	3.00
  | 
	Wing tip modification for hing mount
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-31-2021
  | 
	12.50
  | 
	Left wing tip hing mounting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-29-2021
  | 
	7.00
  | 
	work on wing tip modification to mount with hinges
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-27-2021
  | 
	3.00
  | 
	Work on the wing tip modifications to mount with h
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-21-2021
  | 
	2.50
  | 
	Work on wing tip modifiation to mount with hinges
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-18-2021
  | 
	3.50
  | 
	Cut, fit and drill right fibergalss wing tip
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-15-2021
  | 
	6.00
  | 
	Cutting, fitting, priming, and repeat
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-14-2021
  | 
	2.00
  | 
	Sanding, fitting, and priming
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-12-2021
  | 
	1.50
  | 
	Fiberglass the end pieces of right  Ailerons
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-11-2021
  | 
	1.50
  | 
	Fiberglass in the outer edges of the flaps
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-10-2021
  | 
	2.00
  | 
	Cut foam and fiberglass in Left wing aleron ends
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-05-2021
  | 
	2.00
  | 
	Fiberglass on control surfaces and connecting fair
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-01-2021
  | 
	6.00
  | 
	Empennage Fairing and control surface end points
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-30-2021
  | 
	1.50
  | 
	Sanded and primed the empenage Fairing
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-28-2021
  | 
	2.00
  | 
	Sanding and priming for fit and finish on control 
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-14-2021
  | 
	1.50
  | 
	
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-13-2021
  | 
	4.00
  | 
	Fiberglass, filling, sanding, finish
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-31-2021
  | 
	3.50
  | 
	Pulled the right elevator, cut and fit foam and fi
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-30-2021
  | 
	2.50
  | 
	Filler on control surfaces
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-29-2021
  | 
	2.50
  | 
	Fill left rudder control edge
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-28-2021
  | 
	2.00
  | 
	Cut foam for ends of left elevator
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-26-2021
  | 
	1.00
  | 
	cut foam piece for top if vertical stabilizer
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-23-2021
  | 
	2.50
  | 
	Fiberglass tips on horizontal Stabalizer
  | 
	
			Details 
		 | 
	
			      
				  
		        |