KitLog pro

Powered By Kitlog Pro v2.0

Wesleys Web Site
Work Logs Found: 237
Category Work Time: 766 Hours
 Date
Hours
Work Log Summary

Details

 10-31-2021
3.00
Reinstallation of the elevator push rod and autopi
Details
       

 10-30-2021
9.00
Electrical wiring, mount VPX-Pro and rear ski rack
Details
       

 10-16-2021
11.00
Rivet on the rear fuselage top skin
Details
       

 10-15-2021
2.00
Rivet on rear bulkhead to top rear skin

 10-11-2021
1.50
Prep the rear fuselage for riveting on the top ski
Details
     

 10-03-2021
4.50
Firewall insulation and heat shield
Details
       

 09-04-2021
6.50
nutplates for floor access
Details

 09-02-2021
2.00
Work on nutplates for floor access

 09-01-2021
1.50
Wrapped rear control stick with vinyl and worked o

 08-31-2021
1.00
Nutplates for removable access to fuselage floor
Details

 08-30-2021
2.50
Plate nuts for removable floor
Details

 08-25-2021
1.50
Started drilling and setting nutplates to make the
Details

 11-27-2020
4.50
completed the wing connection tabs for left and ri
Details
       

 11-26-2020
6.00
Form flap fairing, debur, dimple, and rivet
Details
       

 11-17-2020
1.50
Left wing root fairing attachement
Details

 11-16-2020
1.75
Drill, debur, dimple, and rivet on the nut plates
Details
       

 09-07-2020
6.00
Nutplates for wing root fairing
Details

 08-01-2020
8.50
finish the wing attachments/fairings and remove th
Details

 07-17-2020
1.00
Trailing edge flap fairing
Details

 07-14-2020
1.50
Flap fairing and aileron edge alignment
Details

 07-13-2020
2.00
Adjusting flaps push rods and ailerons rods for be
Details

 07-11-2020
6.50
MFG, match drill, and trim wing root fairings
Details
       

 07-09-2020
1.00
Fuel line from fuel pump to firewall
Details
     

 07-08-2020
1.50
Fabricate the fuel and vent lines
Details
       

 07-07-2020
1.00
Fabricating fuel lines
Details

 07-06-2020
1.50
Left tank to fuselage lines
Details

 07-04-2020
8.50
Rebuilt the left tank bracket and install fuel pum
Details
       

 07-02-2020
3.00
mounting flap assembly
Details
       

 07-01-2020
1.75
Left flap assembly
Details
       

 06-30-2020
2.00
Left flap assembly
Details
     

 06-29-2020
1.00
Flap push rod assembly
Details

 06-27-2020
5.00
Attache Aleron push rod assembly and adjust flight
Details
       

 06-23-2020
1.50
mounting the 863 bracket to the fuselage
Details

 06-20-2020
3.00
Fab 860 tank bracket
Details

 06-19-2020
3.00
Bottom skin and tank attachment
Details

 06-18-2020
9.00
inserted the right wing and all measurements neces
Details
       

 06-17-2020
5.00
Removed interior features and insert the left wing
Details
       

 06-16-2020
9.50
Ran brake lines and wrapped the rib sections on ba
Details
       

 06-15-2020
5.50
Modify rib between bagage compartment and instrume
Details
       

 06-10-2020
2.00
sheet metal prep for forward skin
Details
       

 04-29-2020
2.00
Alignment and riveting Baggage door
Details
       

 02-26-2020
2.00
hardware assemble for forward baggage door
Details
       

 06-01-2019
4.50
Baggage door assembly
Details
       

 05-31-2019
2.00
Forward Baggage door
Details
       

 05-30-2019
1.50
Match drilling and top skin assembly
Details
       

 05-29-2019
2.50
Top skin assembly
Details
       

 05-28-2019
2.50
Assembly of the instrument panel with notched flan
Details
       

 05-27-2019
1.50
Working on the forward top skin
Details
       

 05-27-2019
7.50
Prep and seal vent openings. Drill and seal stati
Details
       

 05-25-2019
4.00
Remove bulkheads and top skin and finish dimpling
Details
     

 05-24-2019
2.00
Clecoing on the top tail skin
Details
     

 05-23-2019
1.50
Fabricate wood platforms for working on the tail s
Details

 05-22-2019
1.50
nutplates on gussetts.
Details

 05-18-2019
3.50
Started to work on the turtle back assembly
Details

 05-16-2019
3.50
Plumbing for fuel system
Details
       

 05-09-2019
2.50
Work on fuel, vent lines, and valve.
Details

 05-08-2019
1.00
working on vent lines
Details

 05-04-2019
10.00
Assembled the rudder pedan assebmly
Details
       

 04-27-2019
4.50
Rudder pedal assembly
Details
       

 04-25-2019
3.50
Forward rudder pedal assembly
Details
       

 04-23-2019
1.50
Rear rudder pedal assembly
Details
     

 04-22-2019
2.00
Rear Rudder pedal assembly
Details

 04-20-2019
3.50
Rear Rudder pedal assembly
Details

 04-18-2019
2.00
Rear rudder pedal assembly
Details

 04-17-2019
2.50
Front rudder pedal assembly
Details

 04-16-2019
1.25
bolt the rudder pedal cable guides to the cross me
Details
     

 04-15-2019
2.00
Mount flap motor to control arm and rivet the rudd
Details

 04-10-2019
2.00
Trim rudder stops to correct rudder travel
Details
       

 04-05-2019
1.50
Connect the mid and aft pushrods for the elevators
Details
       

 03-23-2019
4.00
Cut and connect control stick
Details
     

 03-20-2019
2.25
mounting control sticks and assembly
Details

 03-16-2019
11.00
Assembly of push rods
Details
       

 03-09-2019
2.50
Bell housing assembly and fabricate the push-rod
Details
       

 02-24-2019
1.00
Cut part of the counter weight from the right elev
Details

 02-13-2019
1.50
Bolting on concontrol surfaces
Details
       

 02-11-2019
2.50
After removing and deburring the horizontan and ve
Details

 02-09-2019
0.00
Squaring the vertical stabilizer
       

 02-09-2019
8.00
Mounting/attaching vertical stab.
Details
       

 02-06-2019
1.50
Removed red copy and band, installed blue copy and
Details
       

 02-04-2019
1.00
Temporary mount the vertical stabilizer
Details
       

 01-26-2019
4.25
Mounting horizontal stabilizer
Details
       

 01-24-2019
2.50
Vinyl wrap the rear yoke bracket, left throttle as
Details
       

 01-22-2019
1.25
Match drill and rivet nuteplates on throttle assem
Details

 01-19-2019
6.00
interior console and throttle assembly
Details
       

 01-17-2019
1.00
Wrap upper rear baggage compartment skin
Details

 01-17-2019
3.00
design and cut out pieces for a rear tail ski rack
Details
       

 01-16-2019
3.00
Wrap pieces of the seat ramp assembly and rear bag
Details
       

 01-15-2019
1.75
Match drill, debur, dimple, and rivet seat ramp ri
Details

 01-11-2019
2.25
Match drilling, deburing, and riveting nutplates
Details

 01-10-2019
1.75
Debur match dril cover plates for lower midcross m
Details

 01-09-2019
2.50
Rivet stiffiners and wrap both rear floor skins
Details
       

 01-07-2019
2.25
Remove and replace some hardward, rivet nutplates
Details

 01-05-2019
4.00
Rivet and wrap forward floor skin
Details
     

 01-02-2019
1.50
Riveting nutplates and stiffiners
Details
     

 01-01-2019
9.00
Deburing, match drilling, dimpling, and more debur
Details
       

 12-31-2018
2.50
match drill and deburring
Details

 12-29-2018
2.00
Drill small angles for platenuts and front seat hi
Details

 12-28-2018
4.00
Inventory parts bags
Details

 12-27-2018
4.00
Recieve Finishing Kit unpacking and inventory part
Details
       

 12-25-2018
5.00
Match drilling floor assembly
Details
       

 12-24-2018
2.00
Deburring and clecoing the floor assembly
Details
     

 12-22-2018
6.00
Continued work on interiors
Details
       

 12-20-2018
2.00
Riveted cooling ramp
       

 12-18-2018
2.00
seal up cooling ramp
Details
     

 12-15-2018
10.50
Rear seat back and interior finish
Details
       

 12-14-2018
1.50
Bolt the right side skins to Gear Leg weldament
Details

 12-01-2018
3.00
Vinyl wrapped the front seat assembly
Details
       

 12-01-2018
1.50
install the screws/bolts on the left side
Details

 12-01-2018
4.00
Front seat assembly
Details
     

 11-30-2018
1.50
Removing gear legs
Details

 11-24-2018
4.50
Riveting the side skins to lower longerons/gear bo
Details

 11-24-2018
1.50
front seat assembly
Details

 11-21-2018
2.00
More riveting for the bottom skins attachement to
Details

 11-19-2018
2.50
Rivet bottom forward skins to gear leg rib and sid
Details

 11-17-2018
1.50
Rivet the two forward bottom skins to floor assemb
Details

 11-16-2018
2.50
Tank seal applied to foreward skins
Details
       

 11-15-2018
1.50
Riveting bottom skins to fuselage
Details

 11-12-2018
8.00
Match drill, Debur, and dimple bottom forward skin
Details
     

 11-10-2018
2.50
Assembly of bottom skins
Details

 11-08-2018
3.00
Drilling and bolting the left gear leg
Details
       

 11-07-2018
3.25
Drilling, deburing, and bolting right gear leg
Details
       

 11-06-2018
2.00
Measuring again and again, still not cutting/drill
Details
       

 11-05-2018
2.25
Measure and move. Finally drilling outer wear pla
Details
     

 11-02-2018
2.00
Attaching main gear legs
Details
       

 10-30-2018
1.50
Drill main 7/16" holes in bracket and friction pla
Details

 10-26-2018
2.50
Rivet and bolt the seatback plate to the siderails
Details
     

 10-25-2018
1.75
Rivet seat back plate
Details

 10-24-2018
2.00
Rivet siderails to the fuselage assembly
Details
       

 10-23-2018
1.50
Rivet armrest and bulkhead assembly
Details

 10-22-2018
1.50
Final dril and bolt rear seat belt mounts
Details

 10-20-2018
1.50
Wrap vinyl on front bagage area
Details

 10-17-2018
1.50

Details

 10-06-2018
6.00
More vinyl wrapping for interior finish
Details
       

 10-02-2018
1.75
Laying vinyl for interior
Details
     

 09-30-2018
3.50
laying vinyl for some of the finish
Details
     

 09-29-2018
7.00
Finished up riveting the middle bottom skins and r
Details
       

 09-24-2018
3.50
set and rivet bottom middle skin
Details
       

 09-22-2018
10.00
Finished riveting both left and right side skins.
Details
       

 09-20-2018
1.75
Vinyl wrap some pieces
Details

 09-20-2018
1.50
Rivet pieces of the right rear skin
Details

 09-19-2018
1.50
Riveting left rear side skin to lower longeron
Details

 09-18-2018
2.00
Riveting rear side skins
Details

 09-17-2018
1.50
Wrapped the right gear box to match efforts on the
     

 09-16-2018
2.00
Vinyl wrap for left gear column
Details
       

 09-15-2018
7.00
finished up the riveting on the mid skins
Details
       

 09-13-2018
2.00
Spend an hour riveting mid skins
Details
       

 09-07-2018
1.50
riveting mid sikin
Details

 09-05-2018
1.50
Rivet left mid skin
Details

 09-04-2018
1.50
Riveting the left mid skin
Details
     

 08-25-2018
5.00
Rivet the forward skins
Details
       

 08-24-2018
2.00
Rivet forward skins
Details
       

 08-23-2018
2.25
Cleco parts together
Details
       

 08-22-2018
3.75
Rear bulkhead assembly
Details
       

 08-21-2018
3.50
Side Skin riveting and assembly
Details
       

 08-20-2018
3.25
Rivet rear bagage ribs and bulkhead
Details
       

 08-15-2018
1.25
Tank sealer to forward side skins
Details
       

 08-11-2018
7.50
Assembly and rivet sections and route fuel and ven
Details
       

 08-11-2018
2.50
Access panels in gear box
Details
       

 08-09-2018
2.50
Access panels in gear box
Details
       

 08-08-2018
2.00
Back riveting mid side skins and start reassembly
Details
       

 08-07-2018
2.00
Rivet the Mid structure arm rest and bulkheads tog
Details

 08-06-2018
2.50
Attachement of the forward and mid floor
Details
       

 08-04-2018
6.00
Begin the reassembly of the fuselage parts
Details
       

 08-03-2018
3.50
Deburing, dimpling, and priming
Details

 08-02-2018
2.75
Deburing and dimpling
Details

 08-01-2018
1.00
Deburing and dimpling bulkhead and pieces in fusel

 07-30-2018
2.00
Deburing and dimpling fuselage pieces
Details
     

 07-21-2018
5.50
More deburing, dimpling
Details
       

 07-18-2018
1.50
Debur and dimple the Left forward skin
Details
     

 07-17-2018
2.50
Deburing and dimple mid skins
Details

 07-16-2018
1.50
Debur, dimple, left side tail skin
Details

 07-14-2018
8.50
Deburing, painting, and dimpling
Details
       

 07-13-2018
2.00
Countersinking
Details

 07-10-2018
2.00
Countersink dimple and deburing
Details

 07-07-2018
9.00
Match drilling, disassembly, and deburing
Details
       

 07-05-2018
1.00
Cut shape out of tail skin for tailwheel assembly
Details
     

 07-04-2018
6.00
Braces for rear seat roll bar and tail wheel
Details
       

 06-27-2018
2.00
Drilling and clecoing
Details
       

 06-26-2018
3.25
Match drilling and clecoing
Details
       

 06-23-2018
5.50
Match drill mid skins and bottom skins. Drill upp
Details
       

 06-21-2018
2.50
Match drill front skins, Drill holes for top longe
Details

 06-20-2018
2.00
Drilling the forward uper Longerons and forward sk
Details
       

 06-18-2018
2.00
Align and match drill the lower and mid longerons

 06-16-2018
6.25
Upper longerons, Rails, and box covers
Details
       

 06-15-2018
2.50
Bottom skin
Details
       

 05-31-2018
1.00
Cleco tail assembly together with bulkheads and si
Details
       

 05-28-2018
5.00
Deburing skins and lower/mid longeron
Details
       

 05-26-2018
8.50
construction of the rear bulkheads for the tail as
Details
       

 05-24-2018
2.50
Rear bulkhead assembly
Details
       

 05-23-2018
1.50
Tail bulkhead assembly
Details

 05-22-2018
2.50
Tail bulkhead assembly
Details
       

 05-21-2018
3.00
Cleco structure and skin
Details

 05-19-2018
1.50
Disassemble and re-clecoe the left and right mid s
Details

 05-16-2018
2.00
Match drill and cleco left forward skin
Details
     

 05-12-2018
1.50
Clecoe arm rest structure
Details
       

 05-09-2018
2.00
Cut vent lines and clecoed the floor assembly toge
Details
       

 05-08-2018
2.00
forming the mid skins
Details
       

 05-07-2018
1.75
Deburing parts, countersinking nutplates, and rive
Details
       

 05-05-2018
4.50
Deburing arm rest
Details
     

 05-03-2018
1.50
Longeron and gussett fitting
Details

 05-02-2018
1.50
Lower right longeron assembly
Details

 04-30-2018
2.00
Lower left longeron
Details

 04-28-2018
3.50
Fitting lower left longeron
Details

 04-26-2018
2.00
Gussets for mid and lower longerons
Details
       

 04-25-2018
2.00
Bending gear box and bulkhead gusset / web enclosu
Details
       

 04-23-2018
3.00
Forming up the left and right upper longerons
Details

 04-21-2018
6.50
Seat/floor assembly and longerons
Details
       

 04-19-2018
2.00
Rivet inbound forward and aft ribs
Details
       

 04-18-2018
1.50
Rivet seat bulkhead
Details

 04-14-2018
4.00
Deburing and assembly of floor ribs
Details

 04-12-2018
1.50
deburing
Details

 04-11-2018
2.50
Uncleco parts parts and start deburing holes and e
Details

 04-10-2018
2.00
clecoed the floor assembly and match drilled botto
Details
       

 04-07-2018
7.00
Floor assembly and Aileron trim brackets
Details
       

 04-06-2018
1.00
Fabricate 805 support tabs
     

 03-31-2018
9.50
Finish up the bulkhead assembly and start the rear
Details
       

 03-29-2018
2.50
Bulkhead assembly
Details
       

 03-26-2018
2.50
Riveting bulkhead assembly
Details
       

 03-24-2018
9.00
Began the center substructure / bulkhead assembly
Details
       

 03-23-2018
2.00
finishing up the baggage assembly
Details
       

 03-21-2018
2.00
Forward bagage assembly
Details

 03-19-2018
2.00
Debur and flute bagage area assembly
Details
       

 03-17-2018
7.50
Riveted the box assemblies to the floor assembly
Details
       

 03-17-2018
4.00
Finishing up the gear box assemblies
Details
     

 03-15-2018
2.00
Rivet the left gear box assembly
Details
       

 03-14-2018
3.50
Riveting and deburing
Details
       

 03-12-2018
1.50
Countersinking and deburing right box assembly
Details

 03-10-2018
4.00
Countersinking, deburing, and riveting of floor as
Details
       

 03-10-2018
5.25
Box gear assembly, clecoing, match drill and debur
Details
       

 03-08-2018
2.50
Dimple / Deburing floor assembly
Details
     

 03-05-2018
6.50
Forward floor assembly
Details
       

 02-28-2018
2.00
Riveting structure to firewall
Details

 02-26-2018
3.00
Dimple and start riveting structure to firewall
Details
       

 02-24-2018
8.50
Began Firewall assembly
Details
       

 01-10-2018
2.00
Inventory
Details

 01-09-2018
4.00
Unpacking and inventory
Details

 01-08-2018
3.50
Unpacking crate and inventory parts
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.