Work Logs Found: 25
Category Work Time: 106 Hours
 Date
Hours
Work Log Summary

Details

 10-29-2021
1.00
Strip and crimp the RG400 coaial cable for WAAS an

 10-24-2021
4.00
Route Coaxial cable run for rear WAAS antenna
Details

 10-23-2021
1.50
Strip and crimp connectors for both sides of the t
Details

 09-13-2021
3.50
Extending the pitch servo wires 20"
Details
     

 08-21-2021
11.00
Wiring for various components as well as air lines
Details
       

 08-12-2021
1.50
Wiring and cut hole for USB power plug position

 08-11-2021
2.50
Cover plates and forward stick control
Details
       

 08-10-2021
3.00
Run wiring for pilot headphone jack to right fusel
Details
       

 08-09-2021
2.00
Run co-pilot head phone jacks
Details

 08-07-2021
8.50
Wiring for rear of fuselage and left side
Details

 08-06-2021
2.00
Wring run to rear fuselage
Details

 08-03-2021
12.50
De-pinning, pulling wires, re-pinning
Details
       

 08-02-2021
2.50
De-pinning connectors and marking wire to pull lin
Details

 07-19-2021
1.00
Drilled the wirelines for the avionics.

 07-17-2021
12.00
Instation of various avionics components
Details
       

 07-11-2021
4.00
Mounting tray and work on switch plate and wiring
Details
       

 07-10-2021
7.50
installed avionics onto tray and drilled and inst
Details
       

 12-27-2020
8.50
Designing the avionics rack system
Details
       

 12-16-2020
1.50
Reassembled the forward top skin
Details
       

 12-12-2020
1.50
Wrap finish the left side canopy rail
Details

 12-10-2020
1.00
Finish wrap and attach left side rail
Details
       

 12-09-2020
2.00
Wrap left side rail and reinstall forward roll bar
Details
       

 12-08-2020
1.50
Wrapped Right side rail
Details

 12-05-2020
9.00
Assembly of canopy frame, rails, and slide block
Details
       

 11-30-2020
1.00
Riveting and alignment of center rail.
Details
       