KitLog pro

Powered By Kitlog Pro v2.0

Wesleys Web Site
Work Logs Found: 22
Category Work Time: 102 Hours
 Date
Hours
Work Log Summary

Details

 10-25-2021
1.00
Fit upper bracing for ski rack

 06-12-2021
6.00
Mounting smoke system tank
Details
     

 04-03-2021
2.00
Drill for mounting fans to dash/windscreen
Details
     

 11-26-2019
3.00
Travel and unloading at Hangar
     

 11-26-2019
4.00
Project relocation from Las Vegas home to Hangar
Details
       

 05-18-2019
3.00
Ski rack for tail section
Details

 04-26-2019
7.00
Modification made to rudder pedals. Extension of
Details
       

 04-14-2019
2.00
Drilled out the holes and mounted the switches for
Details
       

 04-13-2019
2.00
Set up buttons on control stick
Details

 04-11-2019
3.00
Built the mold from the carved out foam.
Details
       

 03-24-2019
6.00
Design and fabricate a custom control grip
Details

 01-25-2019
4.00
Final fabrication of ski rack brackets
Details
     

 09-03-2018
10.50
Built the access rotisserie
Details
       

 01-14-2018
7.00
EAA Sportsmans Workshop Composit construction clas
Details
       

 01-13-2018
8.00
EAA Sportsman Workshop Composite Construction Clas
Details
       

 01-22-2017
7.00
EAA Electrical workshop
Details
     

 01-14-2017
8.00
EAA Electrical Workshop
Details
     

 05-24-2016
1.50
Attach angle brackets and leveling all thread adju
Details

 05-23-2016
1.50
Drill and anchor the second wing stand
Details

 05-21-2016
2.00
Setting and bolting one of the wing stands
Details

 01-17-2016
6.00
Education 2nd day of Sheet Metal Class
Details
       

 01-16-2016
8.00
Education, Sheet Metal Class
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.