KitLog pro

Powered By Kitlog Pro v2.0

Wesleys Web Site
Work Logs Found: 162
Category Work Time: 426 Hours
 Date
Hours
Work Log Summary

Details

 06-03-2021
2.00
Mounting the wing tips to the wings
Details
     

 02-22-2018
1.50
Rivet right wing flap hinge into place
Details
       

 02-21-2018
1.50
Epoxy in and rivet Pitot tube mast
Details
     

 02-19-2018
7.50
Rivet the outbound bottom skin on right wing
Details
       

 02-01-2018
2.00
mistake and drilling out rivets to remove the wrin
Details

 01-29-2018
2.00
Riveting the bottom skin
Details
       

 01-27-2018
5.00
Rivetted the bottom inbound skin to the right wing
Details
     

 01-24-2018
1.50
drill holes for set screws
Details
     

 01-22-2018
2.00
marked and cut wing skin for pitot tube mast
Details

 01-03-2018
1.00
Mounted the Garmin 28 servo bracket as part of th
Details
       

 01-03-2018
1.50
Aileron assembly for the right wing
Details
       

 12-28-2017
1.75
Riveting bottom skin for left wing
Details

 12-25-2017
7.50
Riveting the bottom skin
Details
       

 12-23-2017
1.50
Removed the push rods andcut out some of the ar
Details
       

 12-23-2017
1.00
Mount the Flap hinge for left wing
Details

 12-21-2017
1.75
Aieron linkage
Details

 12-20-2017
2.00
Assembly of the bell crank and push rods for the l
Details
       

 12-19-2017
2.00
Assembly of pushrods
Details
 

 12-16-2017
7.50
Final assembly of the right flap
Details
       

 12-14-2017
1.50
Riveted the 706 plat to spar and doubler to the ri
Details

 12-13-2017
1.50
Debur and dimple flap skin, ribs, and spar

 12-09-2017
1.50
Riveted the top forward skin to spar connection on
Details

 12-02-2017
9.00
Assembly and riveting
Details
       

 11-30-2017
2.00
Dimple skins, ribs and top spar. Counter sink bott
Details

 11-29-2017
1.75
Debur skins, spar, and ribs
Details

 11-28-2017
2.50
Deburing
Details

 11-27-2017
1.50
Flap assembly, match drill and fabrication of 706
Details
       

 11-26-2017
1.00
Clecoing on the top skin for both flaps
Details
     

 11-25-2017
4.00
Began the assembly of the flaps
Details
       

 11-25-2017
3.00
Assembly of the aileron
Details
     

 11-20-2017
2.00
Left aileron assembly
Details

 11-18-2017
6.50
Completion of the right aileron
Details
       

 11-16-2017
2.00
Right Aileron assembly
Details

 11-15-2017
1.50
Assembly of aileron skins to spar
Details

 11-14-2017
1.50
Aileron assembly
Details
     

 11-13-2017
1.50
assembly of Right Aileron
Details

 11-04-2017
2.00
Cleco the left aileron assembly
Details
       

 11-02-2017
1.00
Reinforement plate for spar/hardware

 10-29-2017
2.00
reinforcing plates for ailerons
Details

 10-28-2017
6.50
Riveting the stiffeners to the aileron skin
Details
       

 10-25-2017
1.50
Match drill stiffenfers to aileron skins

 10-24-2017
2.00
grind and debur aileron stiffeners
Details
       

 10-23-2017
1.50
Cut out aileron stiffners

 10-03-2017
1.50
Bottom wing skin access panel
Details

 09-21-2017
2.50
Access panels for right wing
Details
     

 09-16-2017
4.50
Aleron and flap fairings
Details
     

 09-09-2017
5.00
Aleron and flap fairings on right wing
Details
       

 07-12-2017
1.50
Aleron and flap fairings
Details
       

 07-11-2017
1.50
Torque fuel tank bolts and cleco on flap/aleron br
Details

 07-03-2017
3.50
build wing cradle and move wings from the stands t
Details
       

 06-29-2017
2.00
Riveting together Aileron and Flap brackets
Details

 06-27-2017
2.00
Flap and aileron brackets
Details
       

 06-26-2017
3.00
Finished riveting the left wing top skin
Details

 06-17-2017
7.00
Riveted a good portion of the left wing
Details
     

 06-14-2017
3.00
Team riveting
Details
       

 06-08-2017
2.50
Riveting top skin for right wing
Details

 06-06-2017
3.00
Riveting top skin to right wing
Details

 06-05-2017
2.00
Riveting top wing skin to ribs
Details
       

 05-30-2017
2.00
back rivet main wing skins together
Details

 05-10-2017
2.25
Leading edge assembly and tanks
Details
       

 05-09-2017
2.25
Rivet right leading edge to main spar
Details

 05-06-2017
6.00
Riveting leading edge and attaching to main spar
Details

 05-05-2017
2.00
Rivet leading edge, route stall warning wiring
Details
       

 05-04-2017
1.50
Riveting the left leading edge and Stall warning d
Details

 05-03-2017
1.50
Flared the pitot lines for fittings, Started rivet
Details
       

 05-02-2017
2.50
Conduit line, pilot line assembly
Details
       

 05-01-2017
2.00
Debur, dimple, and cleco top skin for right wing
Details

 04-26-2017
2.00
Right leading edge prepartion
Details

 04-25-2017
2.00
Deburing, dimpling of right leading edge skin

 04-24-2017
2.00
Right leading edge
Details
     

 04-23-2017
0.75
clecoed the painted ribs on the left leading edge

 04-22-2017
5.00
work on the leading edge of the left wing
Details

 04-17-2017
5.00
Re-tested Left tank and sealed up Right tanks
Details

 04-14-2017
1.50
Repair leak in Left tank from failed tank test
Details
       

 04-11-2017
2.00
Seal access panels for both fuel tanks
     

 04-08-2017
8.50
Preparation of Left baffle. Seal fuel sending dev
Details
       

 04-02-2017
1.50
Right Baffle preparation Debur, and D/A finish for
Details
       

 03-20-2017
2.00
Seal and rivet in outbound rib for right tank
       

 03-18-2017
2.00
Rivet in the outbound rib on the left tank

 03-17-2017
2.00
Seal flop tubes and breather lilne
Details
       

 03-16-2017
2.50
Seal and rivet inbound ribs into both tanks. Seal

 03-15-2017
2.00
Seal and rivet in 2nd rib on left tank
Details

 03-14-2017
2.00
Seal and rivet doubler rings for fuel sending unit
Details
 

 03-13-2017
1.50
Fuel sending units, doubler plates
Details
     

 03-04-2017
1.50
Modification for anti-obstruction bracket
Details
       

 03-03-2017
2.00
Tank assembly
Details

 03-02-2017
2.50
Seal and rivet in two more ribs on left tank

 02-27-2017
2.50
sealed and riveted two ribs into left tank
       

 02-25-2017
8.50
Riveted in the interior ribs for the left tank, in
Details
       

 02-24-2017
2.00
D/A (scuff up) rib edges for sealant. Safety wir
Details
     

 02-20-2017
6.50
Preparation D/A surfaces and MEK wash for final cl
Details
       

 02-20-2017
0.00
Photos of sealant
Details
       

 02-20-2017
0.00
Photos of sealant
       

 02-18-2017
8.00
Fuel tank assembly. Fuel caps, drains, and vent l
Details
       

 02-17-2017
1.50
Rivet nutplate to access panel
Details
       

 02-16-2017
1.50
Access panel and doubler ring deburing / dimpling
Details

 02-15-2017
1.50
Drill the oposite rib access panel and match drill
Details
     

 02-14-2017
0.50
Drilled the access hole in the rib with a Fly-cutt
Details
     

 02-13-2017
2.00
Dimpling ribs and wing skins
Details

 02-11-2017
4.00
deburing and hinged door for invertied fuel system
Details
       

 02-10-2017
1.00
Building the fuel sending devise linkage
Details
     

 02-08-2017
1.00
Drill rivet placments for attachement angles and b

 02-06-2017
1.50
Fabricate the two attachement angles
Details
       

 02-01-2017
3.00
Counterskining and deburing fuel tanks/wing skins

 01-31-2017
1.00
Countersinking wing skins for fuel tank

 01-24-2017
2.00
Countersink tank skin
Details

 01-11-2017
3.00
Counter sinking fuel tank skin and main spar point
Details

 12-28-2016
1.25
countersink bottom side of right fuel tank
     

 12-27-2016
1.50
Dimple ribs on Left top wing section. Countersink

 12-26-2016
4.50
Deburing and dimpling wing skins

 12-24-2016
7.00
Skin preparation and Right fuel tank assembly
Details
       

 12-20-2016
1.00
Match drill rib sections with left tank skin

 12-19-2016
1.00
Cleco tank ribs to tank skin
Details
     

 12-17-2016
6.00
Assembly of fuel tanks
Details
       

 12-16-2016
3.00
Debur and dimple wing skins
Details

 12-15-2016
1.00
Deburing wing skins

 12-10-2016
2.50
Baffle construction
Details

 12-05-2016
2.50
Brackets for gas tanks
Details

 12-03-2016
7.00
Bracket construction
Details
       

 11-19-2016
2.00
Bottom wing skin deburing
Details

 11-14-2016
2.00
Debur and dimple the bottom skin
Details
       

 11-13-2016
1.00
debured the left bottom wing skin

 11-12-2016
3.00
Cleco and match drill ribs to main spar assembly
Details

 11-11-2016
3.00
remove bottom wings skins and trim off vinyl prote
Details

 11-05-2016
2.00
Assembly of right wing leading edge
Details

 10-29-2016
4.50
Leading edge assembly for left wing
Details
       

 10-27-2016
2.00
Cleco on the bottom skin for both right and left w
Details

 10-26-2016
1.00
Match drill top skin for left wing

 10-24-2016
2.00
Electrical pumbing
Details

 10-22-2016
1.00
drill top skin matching holes
Details

 10-18-2016
1.00
Rivet Leading edge access door and nutplates
Details
       

 10-17-2016
1.50
Access door for leading edge, left wing
Details

 10-15-2016
8.00
Main spar, Rib and skins
Details
       

 10-12-2016
2.00
Drill holes for flex conduit
Details

 10-11-2016
2.00
Rivet ribs to rear spar assembly
Details

 09-19-2016
1.50
riveting left wing ribs to main spar
       

 09-17-2016
2.00
Rivet and re-rivet ribs to spar
Details
       

 09-10-2016
2.25
Rivet connections for right ribs to main spar

 09-09-2016
1.50
Rivet connections for right ribs to main spar

 08-20-2016
6.00
Main and rear spar assembly
Details
       

 08-18-2016
2.00
Rear spar assembly rework
Details

 08-10-2016
2.00
fluting leading edge ribs
Details
     

 08-09-2016
1.50
Clecoed ribs back to main spar
Details
     

 07-28-2016
3.00
Prep ribs for main spar assembly
Details

 07-27-2016
2.50
Prep on wing ribs
Details

 07-26-2016
3.50
DA/Scuff left wing spars and primer
Details

 07-23-2016
3.00
Debur edges on wing spars
Details

 07-16-2016
2.50
Flute wing spars
Details

 06-25-2016
5.00
work on the rear wing spars for assembly
Details

 06-23-2016
1.50
Bolt on the tie down assemblies
Details
       

 06-22-2016
2.00
Drill platenuts on tie down assembly
Details

 06-21-2016
1.50
Drill and cut spacers
Details

 06-11-2016
6.00
Rivet nut plates, prime counter sinking, and tie d
Details
       

 06-02-2016
1.00
Rivet nutplates to main spar
Details

 05-30-2016
3.00
Countersink main spars for nutplate
Details

 05-28-2016
3.50
Nutplates
Details
       

 05-26-2016
1.50
review plans, lable main spars, and adjust counter
Details

 05-25-2016
2.00
Mounted the right main wing spar to the wing stand
Details

 04-14-2016
2.00
unpacking and inventorying

 04-12-2016
2.00
unpacking and inventory

 04-09-2016
3.00
unpackaging and inventorying parts

 04-07-2016
2.00
Received Wing kit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.